Dard, | don't know Nyou received my response an the 25" but l want to make sure Vou are aware that | ari taking
care of your concerns. On the 25’? laweote that we will Incormorate the drawing modifications into an
addendum. Once the addendum is distributed we willce the MOEO.
‘This should address jrenis 2 and 3.
Dadi ete PDF of the final POR and provide @ hand cony and tigital coy for your use.
Matt,
Based on our review, the following isaues remairy
a) The Engineers response to our comment #3 indicated that the PDA had been corrected, However, we did
nol receive an updated copy of the POR, and thus have no way te confi thet ib was corrected,
2) The Engineers response to aur coranient #6 indicates that the septic tank wes tn be relocated per aur
request, The plans that we received show na change in the location of the septic tank,
3) The detail of the tunk overflow was added buck to Sheet P19, however It contains twa dimensions on the
overflow weir cone that are listed ac "as req'd”, This iscue is the same as that for the sizing of the
tank, MDEC canned issue a permit for “as reas”.
Please note thet | will be oul of the office next week and will return on Agri 7).
Thanks,
Dard J Gotham PE.
Michigan Demernaent of Environmental Quality
Olice of banking Wailer & Municipal Assistance
Saninaw-Bay Distict Ohics
404 Kelchuin Street, Suse b
Bay City Bl 48708
BEO-4250.98 146 (Phone)
BEU-BAT-821 8 (Fae
ee
Sent: Monday, March 24, 2014 6:28 AM
We were crovided the documents from the sanitarian for the intermediate pump station. As shown on the permit the
minimiuan distance is 10 feat. We will have JH address the distance from the pump station as discussed in the review
meeting,
Mike:
At this time, both meetings with KWA, February 27" and March 13", are on roy Outlook calendar, Also, farn nat
planning to attend the February 12" meeting, but i will leave it up to Dary! about his attendance for the Flint portion of
the project.
Personally, | would like to see the surge analysis.
Jon,
| spoke with John O’Malia earlier today. He is checking to see if the proposed meeting dates
will work for us....at this point, John wishes to confirm that the Feb. 27"* and March 13" dates
are open for the 100% review meeting (LHPS and IPS respectively). There is also a 60% review
meeting for S-4006 on Feb. 12" that | plan to attend. Saginaw Bay is welcome to attend...if
not, you can send me any review comments, as needed, prior to that meeting. | also pointed
out to John that we are also interested in receiving the surge analysis given how far along they
are in the pipeline design.
Michael Prysby, P.E.
District Engineer
Office of Drinking Water and Municipal Assistance
517 290-8817
xxxEND_PAGE:deq11_b404_1851_1851_1
John,
Thought I should give you a update of the olan submittals for the Pipeline Contracts (S.4002, $.4003, 5.4005 and
5.4006). The 60% subrnittals will be as shown on the Planning Calendar with one caveat. They will be submitting only
the glans on thase dates, All the specifications and PDR’s are projected to submitted on or before February 4a i still
will have the plans delivered to Jon and Mike the day after they are received per the Planning Calendar and once we
have received the PDR’s & Specifications, | will see that they are delivered to thern as they are received.
Ary questions, please let me know.
Larry A, Osborn, PE, Professional Engineer
555 S. Saginaw Street, Suite 201, Flint, Michigan 48802
£10.236,2556 direct | S1O.S16.6793 cell | 810.295.4975 fax
xxxEND_PAGE:deq11_b403_1848_1850_1
Mike -Please review and let me know what works for you and MDEQ staff/needs. We will schedule what works
for all do you.
John O'
Athached is the mast up to date schedule. We can now begin to look at the MBEO reviews and how they will
get incorporated.
Attached are MDEQ’s comments for the LHPS & IPS — 90% design for tomorrow’s meeting
Also attached are MDEQ’s comments for the Flint Transmission main S-4007 — 60% design for
tomorrow's meeting
Given Saginaw Bay schedule, it would be best, if possible, to cover the pump station
comments first followed by the Flint transmission main comments.
See you all at 8:30am.
Michael Prysby, P.E.
District Engineer
Office of Drinking Water and Municipal Assistance
517 290-8817
xxxEND_PAGE:deq11_b398_1839_1839_1
Attached are draft comments for the 90% submittal (IPS and LHPS) based upon our review and
subsequent discussion. Feel free, as needed, to edit and/or provide any additional
comments. As we discussed, | will contact Jon and Daryl tomorrow at 10am to further discuss
our review comments pertaining to the LHPS. Following our discussion and receipt of any
additional comments, | will prepare a final punch list for our meeting on Thurs. | will also
forward a copy of the punch-list to Genesee County prior to COB tomorrow.
| also attached my comments pertaining to the 60% submittal (S-4007 -Flint pipeline) if there is
an opportunity for further review of this portion of the project.
Michael Prysby, P.E.
District Engineer
Office of Drinking Water and Municipal Assistance
517 290-8817
xxxEND_PAGE:deq25_b213_3352_3352_1
60% plans for the KWA pipeline Contract S-4007 (Flint’s portion) has been received and loaded
on the Lansing Central Drive (T). This also includes the 60% Design Report.
T:\Drinking Water and Environmental Health\Community Drinking Water\District
Offices\Lansing District\KWA-plans
Given that this portion of the project is the Flint contract and in Genesee County, | plan to take
the lead on the review and have comments on behalf of the MDEQ ready for the Jan 6"
meeting. | will accept any additional comments from you if you’re available to review the
plans. We will also be receiving the 90% plans for each pump station next Monday — Dec
23". | will review those plans on the Dec 30" and/or Jan 2".
Michael Prysby, P.E.
District Engineer
Office of Drinking Water and Municipal Assistance
517 290-8817
xxxEND_PAGE:deq11_b397_1838_1838_1
DEQ-See the proposed schedule change with plan delivery as well. I am fine with the revised to allow you to
review plans, in a timely manner, and then we meet at GCDC on Jan 6th at 10:00AM to review both PS'S, a
pipeline and an update on KWA/GCDC, Flint City and status of DWSD.
Wishing you all a Merry Christmas and Happy New Year. Go State. Any questions let me know.
John O'
John,
A little change in plans. The alignment for $.4002, $.4003, S.4005 and $.4006 will be moving to the
greenbelt. Therefore the 60% plans for this work will not be ready to share with MDEQ as
scheduled. Below is what we believe the MDEQ will receive and when. Look this over and if you
have any questions, give either Matt or | a call.
16. WaveTam
Larry A. Osborn, PE, Professional Engineer
555 S. Saginaw Street, Suite 201, Flint, Michigan 48802
Sent: Tuesday, December 03, 2013 3:47 PM
I believe we had a very productive meeting on the 10th. Covered many issues and developed scheduling that
will be efficient/productive for all concerned and work within the compressed design schedule established to
more the project quickly.
The next meetings, including DEQ staff, are as follows:
-Workshop-November Sth at GCDC at 8:00AM. The first hour, for the DEQ staff, will be devoted to a pipeline
surge analysis presentation,
-Pump Station Review-November 19th at 8:30AM at GCDC office. The 60% PS drawings will be submitted to
GCDC 11/6 and then GCDC_ [WT] to send to both DEQ offices,
-Pipeline Review-January 6, 2014 at GCDC office at 10:00AM, the 60% pipeline drawings to be delivered to
GCDC on 12/13 and then GCDC
[WT] to sent to both DEQ offices.
I was agreed that Larry Osborn will hand carry a flash drive to both the Lansing and Saginaw DEQ offices, of
the 60% plans, to expedite the review process and they to put on a LAN system as appropriate. It was agreed
half size drawings are appropriate at this review stage.
It was further agreed that Larry Osborn will email the pipeline PDR and
Matt has sent the pipeline map.
Any questions let me know.
John O'
xxxEND_PAGE:deq17_b125_1038_1038_1
Jon & Steve,
Attached is the first draft of our comments put together concerning the 30% plans for the
LHWI project. Jon, feel free to add or edit any of the comments as | combined some of the
items you listed. Steve, | will plan on discussing these items tomorrow morning with you and
show you some of our concerns on the plans. | may also edit the list tomorrow morning
before | leave for the field — around 10:15am.....
Michael Prysby, P.E.
District Engineer
Office of Drinking Water and Municipal Assistance
517 290-8817
xxxEND_PAGE:deq25_b211_3347_3347_1
DEQ Staff-Note the email from Matt Raysin, from GCDC, regarding drawings and such. Any questions let me
know. AM agenda to follow.. We plan to meet at GCDC on the 10th starting at 8:30AM and should be a full
day.
Any questions let me know.
John O'
wosene nee Forwarded message ----------
Matt-The agenda is for the afternoon, pump station, and at GCDC offices. I thought we were meeting off site?
We will need the AM agenda and location/time as well.
Your thoughts.
xxxEND_PAGE:deq17_b124_1035_1037_1
John O'
iam forwarding each of you 2a copy of Flint WTP summary thet will be discussed during our
meeting next Tues. | will also be reviewing the summary. lt may be worthwhile, if necessary,
to discuss any concerns and/or questions regarding the upgrades prior to the meeting. | will
be in the fleld tomorrow and in the office on Monday.
Michael Prysby, PLE.
District Engineer
Office of Drinking Water and Municipal Assistance
547 290-8817
At our last meeting we discussed a tentative meeting date of June 12th. However, Flint City is in the process of
selecting a consultant to review the WTP on how to activate the plant on a daily basis, if needed. That
consultant will not be on board until after the June 12 tentative meeting date.
Therefore, until a WTP consultant is selected the June 12 meeting is postponed until further notice.
It will be necessary to meet with MDEQ, on final design criteria, for the KWA project, but it is hoped we can
schedule a joint meeting with both Flint City and GCDC to encompass both projects.
More later when the schedule can be firmed up. Any questions let me know.
John O'
xxxEND_PAGE:deq11_b383_1639_1639_1
See attached DWS5D news release with DWSD Director's statement on Flint’s decision ta
commit to purchasing raw water frorn the KWA. In my discussion with Brent Wright, Flint WTP
Supt., there is speculation {concern} of what may happen when the termination of the water
service agreement with DWSD becomes effective on 4/17/2014. Current speculation is that
DWS5D may attempt to recoup thelr “stranded costs” by adding it to Flint’s ready to serve
and/or cormmodity rate for the remaining time that they need to purchase water from the
DWSD (from 4/18/2014 — till KWA water can be piped to the Flint WTP}. [| will pass along any
further updates concerning this matter.
Michael Prysby, PE.
District Engineer
Office of Drinking Water and Municipal Assistance
517 335-6122
Date: Saturday, April 13, 2013 7:23:51 PM
Importance: High
FYI. A decision has been made.
Stephen Busch, P.E.
Lansing and Jackson District Supervisor
Office of Drinking Water and Municipal Assistance
MDEQ
517-643-2314
xxxEND_PAGE:deq01_b068_3612_3612_1
i plan to review Rowe’s report along with the TY report and the other documents for
additional comments this afternoon. | am forwarding this report for your information and/or
review as needed.
Michael Prysby, PLE.
District Engineer
Office of Brinking Water and Municipal Assistance
S17 335-6122