LHPS, IPS, Flint Transmission main - MDEQ comments

Attached are MDEQ’s comments for the LHPS & IPS — 90% design for tomorrow’s meeting Also attached are MDEQ’s comments for the Flint Transmission main S-4007 — 60% design for tomorrow's meeting Given Saginaw Bay schedule, it would be best, if possible, to cover the pump station comments first followed by the Flint transmission main comments. See you all at 8:30am. Michael Prysby, P.E. District Engineer Office of Drinking Water and Municipal Assistance 517 290-8817 xxxEND_PAGE:deq11_b398_1839_1839_1

LHI - 90% P.S. - MDEQ comments

Attached are draft comments for the 90% submittal (IPS and LHPS) based upon our review and subsequent discussion. Feel free, as needed, to edit and/or provide any additional comments. As we discussed, | will contact Jon and Daryl tomorrow at 10am to further discuss our review comments pertaining to the LHPS. Following our discussion and receipt of any additional comments, | will prepare a final punch list for our meeting on Thurs. | will also forward a copy of the punch-list to Genesee County prior to COB tomorrow. | also attached my comments pertaining to the 60% submittal (S-4007 -Flint pipeline) if there is an opportunity for further review of this portion of the project. Michael Prysby, P.E. District Engineer Office of Drinking Water and Municipal Assistance 517 290-8817 xxxEND_PAGE:deq25_b213_3352_3352_1

KWA 60% Plans

60% plans for the KWA pipeline Contract S-4007 (Flint’s portion) has been received and loaded on the Lansing Central Drive (T). This also includes the 60% Design Report. T:\Drinking Water and Environmental Health\Community Drinking Water\District Offices\Lansing District\KWA-plans Given that this portion of the project is the Flint contract and in Genesee County, | plan to take the lead on the review and have comments on behalf of the MDEQ ready for the Jan 6" meeting. | will accept any additional comments from you if you’re available to review the plans. We will also be receiving the 90% plans for each pump station next Monday — Dec 23". | will review those plans on the Dec 30" and/or Jan 2". Michael Prysby, P.E. District Engineer Office of Drinking Water and Municipal Assistance 517 290-8817 xxxEND_PAGE:deq11_b397_1838_1838_1

Re: FW: MDEQ Meetings

DEQ-See the proposed schedule change with plan delivery as well. I am fine with the revised to allow you to review plans, in a timely manner, and then we meet at GCDC on Jan 6th at 10:00AM to review both PS'S, a pipeline and an update on KWA/GCDC, Flint City and status of DWSD. Wishing you all a Merry Christmas and Happy New Year. Go State. Any questions let me know. John O' John, A little change in plans. The alignment for $.4002, $.4003, S.4005 and $.4006 will be moving to the greenbelt. Therefore the 60% plans for this work will not be ready to share with MDEQ as scheduled. Below is what we believe the MDEQ will receive and when. Look this over and if you have any questions, give either Matt or | a call. 16. WaveTam Larry A. Osborn, PE, Professional Engineer 555 S. Saginaw Street, Suite 201, Flint, Michigan 48802 Sent: Tuesday, December 03, 2013 3:47 PM

KWA Meeting Schedule

I believe we had a very productive meeting on the 10th. Covered many issues and developed scheduling that will be efficient/productive for all concerned and work within the compressed design schedule established to more the project quickly. The next meetings, including DEQ staff, are as follows: -Workshop-November Sth at GCDC at 8:00AM. The first hour, for the DEQ staff, will be devoted to a pipeline surge analysis presentation, -Pump Station Review-November 19th at 8:30AM at GCDC office. The 60% PS drawings will be submitted to GCDC 11/6 and then GCDC_ [WT] to send to both DEQ offices, -Pipeline Review-January 6, 2014 at GCDC office at 10:00AM, the 60% pipeline drawings to be delivered to GCDC on 12/13 and then GCDC [WT] to sent to both DEQ offices. I was agreed that Larry Osborn will hand carry a flash drive to both the Lansing and Saginaw DEQ offices, of the 60% plans, to expedite the review process and they to put on a LAN system as appropriate. It was agreed half size drawings are appropriate at this review stage. It was further agreed that Larry Osborn will email the pipeline PDR and Matt has sent the pipeline map. Any questions let me know. John O' xxxEND_PAGE:deq17_b125_1038_1038_1

LHWI 30% plans - MDEQ Comments

Jon & Steve, Attached is the first draft of our comments put together concerning the 30% plans for the LHWI project. Jon, feel free to add or edit any of the comments as | combined some of the items you listed. Steve, | will plan on discussing these items tomorrow morning with you and show you some of our concerns on the plans. | may also edit the list tomorrow morning before | leave for the field — around 10:15am..... Michael Prysby, P.E. District Engineer Office of Drinking Water and Municipal Assistance 517 290-8817 xxxEND_PAGE:deq25_b211_3347_3347_1

FW: Flint WTP

iam forwarding each of you 2a copy of Flint WTP summary thet will be discussed during our meeting next Tues. | will also be reviewing the summary. lt may be worthwhile, if necessary, to discuss any concerns and/or questions regarding the upgrades prior to the meeting. | will be in the fleld tomorrow and in the office on Monday. Michael Prysby, PLE. District Engineer Office of Drinking Water and Municipal Assistance 547 290-8817

Meeting with Flint City and GCDC Office

At our last meeting we discussed a tentative meeting date of June 12th. However, Flint City is in the process of selecting a consultant to review the WTP on how to activate the plant on a daily basis, if needed. That consultant will not be on board until after the June 12 tentative meeting date. Therefore, until a WTP consultant is selected the June 12 meeting is postponed until further notice. It will be necessary to meet with MDEQ, on final design criteria, for the KWA project, but it is hoped we can schedule a joint meeting with both Flint City and GCDC to encompass both projects. More later when the schedule can be firmed up. Any questions let me know. John O' xxxEND_PAGE:deq11_b383_1639_1639_1

FW: DWSD News Release: DWSD Director's Statement on Flint Decision

See attached DWS5D news release with DWSD Director's statement on Flint’s decision ta commit to purchasing raw water frorn the KWA. In my discussion with Brent Wright, Flint WTP Supt., there is speculation {concern} of what may happen when the termination of the water service agreement with DWSD becomes effective on 4/17/2014. Current speculation is that DWS5D may attempt to recoup thelr “stranded costs” by adding it to Flint’s ready to serve and/or cormmodity rate for the remaining time that they need to purchase water from the DWSD (from 4/18/2014 — till KWA water can be piped to the Flint WTP}. [| will pass along any further updates concerning this matter. Michael Prysby, PE. District Engineer Office of Drinking Water and Municipal Assistance 517 335-6122

GCDC/MDEQ Meeting Friday February 8, 2013

We are meeting at 10AM at the GCDC office. The meeting purpose it to meet the MDEQ and GCDC design team and discuss the status of the general design issues and to update MDEQ with timeline and status of Flint City involvement in KWA. It is planned to bring lunch in and to adjourn around 2ish depending on depth of discussion. Any questions call or email. Plan on seeing you all Friday the 8th. Thanks for keeping your schedule open. John O' xxxEND_PAGE:deq11_b430_1911_1911_1

KWA Meeting

John o’ Malia called me back to confirm the KWA meeting date with Genesee County at their office. The meeting will be on Friday Feb 3 at 10am. John will be sending us an official e-mail notice tomorrow. John also asked for Steve Ashford to attend the meeting due to his anticipated role in plan review and permitting the transmission main component of the project up to the raw water reservoir. Michael Prysby, P.E. District Engineer Office of Drinking Water and Municipal Assistance 517 335-6122 xxxEND_PAGE:deq11_b375_1627_1627_1

RE: Flint - Dept of Treasury

Great answers, Mike. The only camments/clarifications | have are in regards to the question on the use of the DWRE to operate the treatment plant fulltime. The DWRF may be used to construct facilities necessary to make full time operation feasible. However, it should be clear that “operating costs” are not eligible. Also, ary application to the DWRE requires 4 comprehensive, 20-year project plan, not a one-time, prohect specie request. The fact that the city of Hint recently turned down a DWRF loan even with a significant portion of it to be “forgiven” thet was intended to address high priority distributian systern needs cannot be overlooked. The city would have to inchide these needs in any revised/new project olan and satisfactorily explain any decision to not inchide these distribution improvements in this new loan anplication.