RE: S-4004 MDEO comments

Dard, | don't know Nyou received my response an the 25" but l want to make sure Vou are aware that | ari taking care of your concerns. On the 25’? laweote that we will Incormorate the drawing modifications into an addendum. Once the addendum is distributed we willce the MOEO. ‘This should address jrenis 2 and 3. Dadi ete PDF of the final POR and provide @ hand cony and tigital coy for your use.

S-4004 MDEQ comments

Matt, Based on our review, the following isaues remairy a) The Engineers response to our comment #3 indicated that the PDA had been corrected, However, we did nol receive an updated copy of the POR, and thus have no way te confi thet ib was corrected, 2) The Engineers response to aur coranient #6 indicates that the septic tank wes tn be relocated per aur request, The plans that we received show na change in the location of the septic tank, 3) The detail of the tunk overflow was added buck to Sheet P19, however It contains twa dimensions on the overflow weir cone that are listed ac "as req'd”, This iscue is the same as that for the sizing of the tank, MDEC canned issue a permit for “as reas”. Please note thet | will be oul of the office next week and will return on Agri 7). Thanks, Dard J Gotham PE. Michigan Demernaent of Environmental Quality Olice of banking Wailer & Municipal Assistance Saninaw-Bay Distict Ohics 404 Kelchuin Street, Suse b Bay City Bl 48708 BEO-4250.98 146 (Phone) BEU-BAT-821 8 (Fae ee Sent: Monday, March 24, 2014 6:28 AM

Fwd: FW: Updated KWA Planning Calendar

John, Thought I should give you a update of the olan submittals for the Pipeline Contracts (S.4002, $.4003, 5.4005 and 5.4006). The 60% subrnittals will be as shown on the Planning Calendar with one caveat. They will be submitting only the glans on thase dates, All the specifications and PDR’s are projected to submitted on or before February 4a i still will have the plans delivered to Jon and Mike the day after they are received per the Planning Calendar and once we have received the PDR’s & Specifications, | will see that they are delivered to thern as they are received. Ary questions, please let me know. Larry A, Osborn, PE, Professional Engineer 555 S. Saginaw Street, Suite 201, Flint, Michigan 48802 £10.236,2556 direct | S1O.S16.6793 cell | 810.295.4975 fax xxxEND_PAGE:deq11_b403_1848_1850_1

KWA Meeting Schedule

I believe we had a very productive meeting on the 10th. Covered many issues and developed scheduling that will be efficient/productive for all concerned and work within the compressed design schedule established to more the project quickly. The next meetings, including DEQ staff, are as follows: -Workshop-November Sth at GCDC at 8:00AM. The first hour, for the DEQ staff, will be devoted to a pipeline surge analysis presentation, -Pump Station Review-November 19th at 8:30AM at GCDC office. The 60% PS drawings will be submitted to GCDC 11/6 and then GCDC_ [WT] to send to both DEQ offices, -Pipeline Review-January 6, 2014 at GCDC office at 10:00AM, the 60% pipeline drawings to be delivered to GCDC on 12/13 and then GCDC [WT] to sent to both DEQ offices. I was agreed that Larry Osborn will hand carry a flash drive to both the Lansing and Saginaw DEQ offices, of the 60% plans, to expedite the review process and they to put on a LAN system as appropriate. It was agreed half size drawings are appropriate at this review stage. It was further agreed that Larry Osborn will email the pipeline PDR and Matt has sent the pipeline map. Any questions let me know. John O' xxxEND_PAGE:deq17_b125_1038_1038_1