Re: Technical Advisory Meeting

To
Brent Wright , Dayne Walling , Donna Cole , Marc Edwards , Gerald Jed) Natzke , Howard
Croft; Henry, James; Jason Lorenz; jmikewright; JoAnne Herman; John O'Brien; Kirk Smith; [email protected]; Laura Sullivan; Michael Glasgow; Michael Wright; Mike Lane; Prysby, Mike (DEQ); Natasha Henderson; Norb Birchmeier; Pete Levine; Robert Bincsik; [email protected]; Russell Hudson; Samir Matta; [email protected]; Sean Kammer, Warren Green; Busch, Stephen (DEQ); [email protected]; James Gaskin; Amy Hovey; Andy Leavitt

Water Quality Update

Technical Team, | am writing to provide you an update on the City's ongoing plan to improve the water quality in the City of Flint. This morning, the U of M Flint announced that recent testing showed 48M levels slightly above the : in two of its buildings. The City responded to this recent information of concern with increased flushing in the area where subsequent internal tests have shown the levels to have subsided to under than 80 B86. The ‘Ff 84 level leaving the water plant is currently in the 45 -55 #6 range and in areas with minimal circulation the level can rise by the time it reaches a tap. The installation of new filter media at the water plant which is designed to greatly reduce the EE HV level in the plant is ahead of schedule and is expected to be installed by mid-July. The DEO has approved the design and actual testing by the vendor over the past two weeks has veriieg that the selected media should work. This is expected to have an immediate impact In addition to the filter installation, we have engaged in increased valve exercising over the last two months and have checked over half of the 7,000 valves in the system. The valve turning has a tendency to result in temporary water discoloration but increases the overall water circulation and identifies areas where valves are inoperable. Our annual Consumer Confidence Report will be distributed in early July and will contain significant information about the water system. We will also include the notice of our recent quarterly testing in 1 xxxEND_PAGE:deq16_b5_0892_4900_0241 sostoasrate which all eight sites were verified to be under the MG but the running average at one site required a notice to be sent. | will email everyone when we schedule the next The team meeting which we have currently targeted for mid-August. Howard Croft Public Works Director City of Flint 1101 S. Saginaw Street Flint, MI 48502 PH# 810.766.7135 Ext.2043 herofi@citvefint com xxxEND_PAGE:deq16_b5_0892_4900_0242

Technical Advisory Team Meeting _ May

All, Iam sending everyone the TAC team agenda for Wednesday's meeting, there is room left for general conversation regarding next steps and future agenda's. We look forward to seeing everyone that can make it to City Hall tomorrow. Thank you, Howard Croft Public Works Director City of Flint 1101 S. Saginaw Street Flint, MI 48502 PH# 810.766.7135 Ext.2043 xxxEND_PAGE:deq16_b5_0892_4900_0950 2:00 pm 2:05 pm 2:10pm 2:20 pm 2:40 pm 2:50pm 3:30pm 3:35 pm Flint Water Technical Advisory Committee May 20, 2015 Flint City Halt Agenda Weicome Purpose of the Technical Advisory Committee: Provide a respectful means of sharing factual information and having dialogue around the City of Flint water. Introductions Current water status information - M. Glasgow, Operator in Charge (F-1) improvements Information — H. Croft, Director Department of Public Works New filter media installation Leak detection New pipe installation Water meter installation New water page on City website Discussion on next TTHM testing expectations Discussion on current health concerns, including lead and copper testing Next Steps Next meeting, one manth or two months? Adjourn Sources of Information: City Website: CityofFiint.com See Residents: WATER or Departments: Public Works: Utilities - many links to reports, Q&A and other useful information. if you, or another Flint resident, would Jike to have their water tested: call 810-766-7135 ext 2606 xxxEND_PAGE:deq16_b5_0892_4900_0951

Water Update

All, We still have not received the violation notice from the DEQ although we expect it any day now. We continue to work on what additional documentation will accompany the letter and still plan to vet that through this group. | We would like to have the notice in hand to verify how it reads before completing our draft copy of accompanying documents. We are planing to have another community advisory group meeting next Thursday March 19th. I will wait to set the next Technical Advisory Meeting date and agenda until after that group meets. Thank you, Howard Croft Public Works Director City of Flint 1101 S. Saginaw Street Flint, MI 48502 PH# 810.766.7135 Ext.2043 [email protected] xxxEND_PAGE:deq02_b217_2888_3366_049 Rennaker, Joanne (DEQ)

Tech Committee Follow up

November.pdf; Tech Committee Presentation - Veolia.pdf All, I want to thank everyone for attending our first Technical Committee Meeting yesterday, by all measurements this was a very successful first gathering. I am forwarding everyone an electronic copy of the materials shared yesterday including the presentation by Veolia. As for next steps, I am looking for literature form DR. Rose and from Michael Wight of the EPA to come within the next day or two. I also would like to have specific questions that anyone feels should be included in a bullet point list so that we can move quickly to generate the best responses. Next week I will look to vet with this group the information that we intend to send to the community along with the next violation notice. Our goal is to have documented information in everyone's hands prior to the mailing of the violation. We will also plan to have another meeting very early in April to assess the community response to the upcoming notice, evaluate if there are items coming from the community advisory group that need to be addressed, share the internal water plant progress, and to determine our next steps. Thank you again, Howard Croft Public Works Director City of Flint 1101 S. Saginaw Street Flint, MI 48502 PH# 810.766.7135 Ext.2043 j xxxEND_PAGE:deq16_b5_0892_4900_0148 xxxEND_PAGE:deq16_b5_0892_4900_0149 City Of Flint Water Forum CONTENTS Water History Facts ...cccc 3 Frequently Asked QueStions 4 Budget Allocation and Fund Expenses. 5 Asset / Revenue Charts 6 Recent Timeline of Water and Sewer FUNAS 7 City of Flint- Water and Sewer System Additional Asset / Revenue Data ........-00....s0000. 8 Calculation of Water and Sewer Rates for FY13 Budget 9 Example Water Bill 10 TUrn-Off POLICY 11 Preliminary Options for Future City of Flint Water Sources 12 xxxEND_PAGE:deq16_b5_0892_4900_0150 City Of Flint Water History Facts Current Treatment Plant was put into service in 1954. . Current 72” main pipeline was completed in 1970. Flint signed a 30 year contract with Detroit water and Sewer Department in the mid 1960's. . The contract with DWSD has expired and we are currently operating on a yearly extension, In 2006 Flint completed a $48,000,000 upgrade of the existing Water Plant. (Required by the MDEQ & for backup only). Flint’s Waiter & Sewer System is approximately a 300,000,000 Enterprise. . Flint's Water & Sewer System is designed to deliver water to over 200,000 people with over 1,500 miles of infrastructure, Flint's most recent census count shows a population of approximately 102,000 in 2010. Flint’s census population in 2000 was approximately 124,000. The water system had over 45,000 customers in June of 1999, The water system had just over 36,000 customers by June 2011. The “Fixed Costs” that must be covered to maintain the system and deliver quality water have increased over time. xxxEND_PAGE:deq16_b5_0892_4900_0151 City Of Flint Most Frequently Asked Questions about Water OWhy are the water rates so high ? Q)How does my water bill work (Explanation of charges) ? OlWhy do others in the area pay less for the same amount of water ? OlWhere has all of the water and sewer fund money gone ? OWhat do | do if | think my bill is incorrect ? OWhat effect does leakage or theft have on my bill ? QIHow can {f report water theft ? OlWhy don’t we go back to using the Flint River like we once did ? xxxEND_PAGE:deq16_b5_0892_4900_0152 City of Flint Budget Allocation and Fund Expenses. City af Fling Water and Sewer Fund Expanses Water & Seaver fends a Audited a 2008 Actua} 2009 Aviual 210 Actual 2071 ete Operating Revarues- Mther Revenues Annual Revenues 20,919 987° 2B.81R 817 SoiZ.96a BS8SB09 4,208. 5, BSOESe 20,098 Andual Expertise xxxEND_PAGE:deq16_b5_0892_4900_0153 Cityat Aint Unrestricted Net Assets {Lia PY S007 thragals F¥2022 SGAOR DOR ene Bex PAAR * YSRLCNG 000) Revenues: 13618 a hail 6 304,082 cing af Sint Waterand Sewer fund eg : Current Assets anid List ities. il il ‘ | 39,009,008 | _. Saben.n8 : : FS omonn inna’ Assets soondtensses: | soot ere? GRbHibes SONORAN SSS II, NS SO eaten a ene tad prevecnnntcoces eet xxxEND_PAGE:deq16_b5_0892_4900_0154 GHy.of Flint Recent Tnveline.of Water and. Sewer Funds FY 2007 through 2078 523M Wiiter en ‘ncresge i. Neveg adjustment 3.6M Retires bealthes CAPE, ANE Si5.7M Lawsuit settiod: Aoeeivdee teens | Budgeted: use of equity ter 1 Bal fgnce budget orate ASE IeAE 56.3 New OPES daily | Budgeted use of etiuity ts Balance: budget: sot ahaa ee xxxEND_PAGE:deq16_b5_0892_4900_0155 Expenses have exgonted levenges every yearsines 2008¢ 2008 SGGG ant ants. 2643 Rdvenues: -Hnrescrved Rate ‘Mins. Syateot _ Beck, Reyonuds Sxmgeisds s48 QSOGSSTSS NGS SR. NG Supa7s, Bq6.399,452 BR4O25.068 ROIS SH22AO NRG. SOULETEAzZE “Wister parchase costincreasa 8 3. FACTORS IMPACTING sn a Be ROE pays added-es pari ehohyf 4.9 AS Nordté wdkisttien Useotriigihed dafniigs Bidgeied Ssvehud-lnehlve ts re6 Useotrenmined aa tA & 3 es tn Laainitigs budgeisd ‘Gt ohasG.nost ihereas Dod oS Allpeaiios As xxxEND_PAGE:deq16_b5_0892_4900_0156 Calculation of Water and Sewer Rates for FY13 Budget March, 2012: Water $49.9 $44.4 Sewer $31.0 $21.4 TOTAL $80.9 $65.8 xxxEND_PAGE:deq16_b5_0892_4900_0157 CITY of FLINT, MICHIGAN Le ae WATER &/OR SEWER BILL Ly aepeid FIRST CLASS MAIL Senice at: $810 BALDWIN BLVD MI 4eSOt us! POSTAGE PAID : 3419 Active Seqe3i98 [ACCOUNTNUMBER] DUE DATE : Re 02282012 LVAIVINMUIOU AA T=SHE | jeu BE lint hibit YOUR PAYMENT . Hag ygadpyoteseg | gl fff gegf aa Esq ag oflf fl geg gps eH ttt ef 000003768 L0000014 76 502242012000001491377706 KEEP THIS PORTION FOR YOUR RECORDS [GHARGE [Prev waience [| 167.08) ig CiOanoi2 A 363 ny} thy ie = re a Lo 6.00 PENALTY ASSESSED 30 DAYS AFTER DUE DATE xxxEND_PAGE:deq16_b5_0892_4900_0158 CITY OF FLINT DEPARTMENT OF FINANCE Customer Service Center Dayne Walling Rougias Ringeman Mayor Piste gis cath . CITY OF FLINT iy H WATER NON-PAYMENT TURN-OFF POLICY . Water services to any customer may be shut off if the account is not paid until after 30 days after the due date. (Ciw onlinance 46-52 (h)) Non-payment tum-offs are done only Monday through Thursday. The Customer Service Center docs not schedule non-payment turn-offs on Fridays, Saturdays, Sundays, or most recognized holidays. Hiegal usage, broken payment arrangements and NSF (non-sufficient funds) turn-off are done at any time without additional notice. Turn-off notices are mailed to delinquent customers fifleen (15) days before actual um-off. ‘The water customer is responsible for maintenance of all plumbing in the premises including connection to City water mains or sewer lines, Sh Wye ery . Ha customer disputes a water bill and is unable to resolve the issue with Customer Service personnel, the customer may request an administrative review. Further information on any water account may be obtained by calling (816) 766-7015 or visiting the Customer Service Center at }* Floor, City Hall, 1101 S. Saginaw St. 11 xxxEND_PAGE:deq16_b5_0892_4900_0159 Preliminary Options for Future City of Flint Water Sources Consider a New Negotiated Contract with Detroit Water and Sewer Department Lack of control over new / fixed changes Past practices No upfront capital costs Possibility to negotiate a lower rate Ability to "Blend" water sources to further control costs Consider_a Contract with the Karegnondi Water Authority Voting memser of KWA board Capital cost (debt service} Ability to "Blend" water sources to further control costs Uncertainty of final costs Raw water is an asset for attracting new buisnesses Blended Use of the Flint River Helps contro cost of water *** CURRENTLY NO DECISIONS HAVE BEEN MADE REGARDING THE FUTURE WATER SOURCE 12 xxxEND_PAGE:deq16_b5_0892_4900_0160 a Improvements for City of Flint Water System Reduce Leakage =Finalize a Preventative Maintenance Plan > (Planning started in January 2012, requires funding, ... part of Operational Costs) > Will help identify repair area’s "Reduce water theft "Replace water meters >We currently have an eighteen month plan to replace all meters with mote efficient “Smart Meters” "Encourage routine household checks >“Faulty” toilets are a significant reason for household water loss. and unexpected larger bills. Other Leakage concerns ¥ Transmission Loss “Fire Hydrants V Incorrect water bills v¥Non-Peyment 13 xxxEND_PAGE:deq16_b5_0892_4900_0161 in Breaks 2014 Water Ma rt Repo in Breaks from Leak = = SSR FNS ae SES Tae t 2 SSR é 3. =o xxxEND_PAGE:deq16_b5_0892_4900_0162 City of Flint Water System Facts SSO ELIE EAT To Over 600 Miles of Distribution Mains Over 7000 Valves Over 3909 Hycrants Over 46,000 users in 2006 Only 31,000 users in 2014 xxxEND_PAGE:deq16_b5_0892_4900_0163 What Can Impact Water Quality ? Condition of source water » Temperature » Organic material » Retention time in system Low flow » Deac ends » Main Breaks > Repairs Quality Indicators * Chiorine residual * Total colforms xxxEND_PAGE:deq16_b5_0892_4900_0164 % & Wii, Add , aia Z tinue, & Witte wanna haba % 4) “Cerny, we yy esas 4% Ottery yy xxxEND_PAGE:deq16_b5_0892_4900_0165 CITY TESTING 10 test sites around the city Tests are performed manually 2 — 3 times a week Over 100 Tests are performed a month All tests are reported to the DEQ for oversight Tests are performed EVERY four hours inside the Plant The City responds to and tests all reported concerns xxxEND_PAGE:deq16_b5_0892_4900_0166 Michigan DEQ State License Types Complete Treatment Limited Treatment Distribution D-1 D-2 xxxEND_PAGE:deq16_b5_0892_4900_0167 Recent Boil Water Advisories in MICHIGAN eh .rrt—sr—C xxxEND_PAGE:deq16_b5_0892_4900_0168 City of Flint Contacts Public Works Director Howard Croft — [email protected] Utilities Administrator Daugherty Johnson- [email protected] Plant Supervisor Brent Wright — [email protected] F-1 Operator in Charge Mike Glasgow — mglasgow @cityofflint.com S-1 Operator in Charge Phone Numbers City of Flint Treatment Plant 810-787-6537 Public Works Director 810-766-7346 x 2403 Utilities Administrator 810-766-7135 x 2602 EPA Safe Drinking Water Hotline 1-800-426-4791 xxxEND_PAGE:deq16_b5_0892_4900_0169 <t “aly. ye east ed % Gs £4% oy Pity dette thn, pad Ws fie 4% 9 Little f y Ge he Wie : ae time Gh fy ae By “ty, dyed. gi tye oe * tills Ay 2% © “aah a Ye yt, Vit 4s fit CO tide, EY tien ye Yu be Reduce ime of water in-system evel to match demand ‘Hited consultant Veolia for process review xxxEND_PAGE:deq16_b5_0892_4900_0170 wy Bee xxxEND_PAGE:deq16_b5_0892_4900_0171 ONS! ie o Water plant improvements ° Distribution system improvements » Better communication with customers xxxEND_PAGE:deq16_b5_0892_4900_0172 carbon dioxide 3 xxxEND_PAGE:deq16_b5_0892_4900_0173 a an —) hence H 3 3 TOC, mg/L Ri Ozone Clarifier Softener ‘Filter Filter Plant wer Effluent Effluent Effluent Influent Effluent R? LAPo AY sees 33: S Yacdreis: Soi sary Narre an As Marci 4. 2018 Tactical Sdvisary Camraittes: xxxEND_PAGE:deq16_b5_0892_4900_0174 UV Absorbance, cm* apnea Pink coloration R? = 0.9753 xxxEND_PAGE:deq16_b5_0892_4900_0175 0 5 a a an a nie: a D a ho ee a a 5 8 0 7 5 7 ee Gee a SS ‘ 4. 0 6 5 6 ia “4. 0 5 5 5 feces ne a bromate on 5 4 imum ozone format 0 3 minimize be 5 mg/L to Max: dosage appears to 5 20 25 3 : aa ee ae io sans b mee aoe = nee + a : — 01 5 1 0 0 ¢ f 0 Nownoeveowrrtnoenvyoet nN © N A ws ae ase as os 1/8n ‘ aeul01g 9761 =0 R2 mg/L Ozone Dosage, a xxxEND_PAGE:deq16_b5_0892_4900_0176 TOC, mg/L 10 20 30 40 50 60 FeCl, Dosage, mg/L 70 80 90 100 R’ = 1.00 xxxEND_PAGE:deq16_b5_0892_4900_0177 —— i Current Operating : Point Alkalinity... Hardness... Y~ALneE SS Optimal Point Concentration, mg/L as CaCO, 140 160 180 200 220 240 260 280 300 Lime Dosage, mg/L xxxEND_PAGE:deq16_b5_0892_4900_0178 Activities to Help Operators Maintain Good Water Quality e Process Control Management Plan o Lab QA/QC Program e Computerized Maintenance Management System e Asset Management System o Training and Certification Program e Vulnerability Plan xxxEND_PAGE:deq16_b5_0892_4900_0179 e Speed up flow of water from plant to homes — 2 weeks plant to house Sind clased valves & & agen fren a Sy ¢ o Replace braken valves « Reduce sysiem sforage e Track customer complaints fest customer water ao vs fo clean arsas of xxxEND_PAGE:deq16_b5_0892_4900_0180 Develop a proactive customer communication plan » Create advisory committees to help direct efforts and improve flow of information e Add additional communication personnel for the utility e Develop a pro active communication program e Establish a single point of contact to manage all water quality complaints » Provide additional customer service training and tools to staff » Expand neighborhood and community outreach » Change monthly billing statements from card to envelope with information xxxEND_PAGE:deq16_b5_0892_4900_0181 xxxEND_PAGE:deq16_b5_0892_4900_0182

: First Technical Team Meeting

Technical Team Members, This is a reminder of our first meeting date next Wednesday March 4th at Flint City Hall at 2:00 - 4:00 pm. Please bring any questions or goals that you would like to see developed out of the group as we will create the final overarching agenda in the committee. On a side note, our February TTHM test results were re returned from the state lab this morning and all eight test sites are substantially below the MCL. I look forward to seeing everyone on Wednesday. Regards, Howard Croft Public Works Director City of Flint 1101 S. Saginaw Street Flint, MI 48502 PH# 810.766.7135 Ext.2043 - [email protected] xxxEND_PAGE:deq27_b336_1832_1944_066 ational Evaluation Report xxxEND_PAGE:deq27_b336_1832_1944_067 City of Flint Operational Evaluation Report March 1, 2015 , MDEQ Comments . Revise Tables 2 and.3 on Page 7 to account for proper alignment of DDBP _ samples (results, location, site code). Also, revise statement on Page 1 regarding the number of sites exceeding the TTHM MCL following the 4" -* Quarter sample cycie. . The ozone system was recently repaired. (Page 10 & 19). What is the ozone system’s current production rate? . The city’s hydraulic model (prepared by Potter Consulting) is being updated (Page 16). Is the model currently sufficient in determining proper sizing for the transmission main replacement in DuPont & Bishop Street corridor? (currently sized at 24-inch) (Pages 5, 16, and 20) . Are the potassium permanganate results & conclusions available? - (Pages 4 and 17) . We agree that some reduction in storage volume could be achieved without compromising reliability; however given high usage, main breaks, and “let runs” during the winter, storage volume remains important. We agree with the need to determine adequate storage volume which will likely differ between summer and winter. (Page 15) We agree with the concern of re-circulation of water pumped from the booster pump stations; however, we were recently informed of existing distribution system check vaives to prevent recirculation. These _ appurtenances and their condition need to be confirmed. The hydraulic model may also need to be updated to include these valves. (Page 15) . We concur with the rexommendation to provide the ability to monitor raw - water TOC and PTAP TTHM. (Pages 17 & 18) Page 20 provides 2 options to manage ee age and each option includes reducing the utilized storage volume of the 3 MGAL well to 2 MGAL. ,The - ’ reduction in storage volume limits the WTP’s ability to meet CT under worst case conditions (low temp, high pH, 30 MGD pumping rate from reservoir). . Table 11 on Page 21 outlines an Action Plan for Stage 1 and, Stage 2 actions. Several actions listed in Stage 2 including; repair of ozone system, continued _ valve replacement, and replacement of deteriorated watermains are longer term solutions; however, they need to proceed regardless of the outcome of TTHM reduction. ‘ xxxEND_PAGE:deq27_b336_1832_1944_068 Lockwood, Andrews PLANNING CL FEDEX BMANSERING 526 WEST ALLEGAN STREET Reports Submittal Dats: Thats MITTAL Filing Date code 10F SOUTHAINGEN ROAD cuisteibution H endiogures de ne intgaddad fo-repisite ie hve gets Het xxxEND_PAGE:deq27_b336_1832_1944_069 EXECUTIVE SUMMARY Benn identified as px xxxEND_PAGE:deq27_b336_1832_1944_070 ane xxxEND_PAGE:deq27_b336_1832_1944_071 xxxEND_PAGE:deq27_b336_1832_1944_072 polymer aid KREG S BALY: ¥ xxxEND_PAGE:deq27_b336_1832_1944_073 xxxEND_PAGE:deq27_b336_1832_1944_074 wide xxxEND_PAGE:deq27_b336_1832_1944_075 | xxxEND_PAGE:deq27_b336_1832_1944_076 Hy Stack xxxEND_PAGE:deq27_b336_1832_1944_077 4 SOURCE WATER EVALUATION A. DATA ANA xxxEND_PAGE:deq27_b336_1832_1944_078 xxxEND_PAGE:deq27_b336_1832_1944_079 xxxEND_PAGE:deq27_b336_1832_1944_080 xxxEND_PAGE:deq27_b336_1832_1944_081 ge range af A'S areas f . icing TAMFP within thx ae range of 20° xxxEND_PAGE:deq27_b336_1832_1944_082 xxxEND_PAGE:deq27_b336_1832_1944_083 age = 13 MOO ing Jactér to bigh xxxEND_PAGE:deq27_b336_1832_1944_084 4M. fonnatior s fikert at the dk of the year. xxxEND_PAGE:deq27_b336_1832_1944_085 xxxEND_PAGE:deq27_b336_1832_1944_086 xxxEND_PAGE:deq27_b336_1832_1944_087 lidrasituctare: ange Recaramendations QUINONE v i that xxxEND_PAGE:deq27_b336_1832_1944_088 xxxEND_PAGE:deq27_b336_1832_1944_089 xxxEND_PAGE:deq27_b336_1832_1944_090 xxxEND_PAGE:deq27_b336_1832_1944_091 xxxEND_PAGE:deq27_b336_1832_1944_092 Removal — 40 ayy so GO: Be BO Bo Dosage (e/") xxxEND_PAGE:deq27_b336_1832_1944_093 8 & xxxEND_PAGE:deq27_b336_1832_1944_094 % Removal @ Somes berrie xxxEND_PAGE:deq27_b336_1832_1944_095 % Hemaual Rita a Dosage (mest) ey Ferric &. 6o xxxEND_PAGE:deq27_b336_1832_1944_096 46 Reretwat aw Dosage (mg/tf 1s xxxEND_PAGE:deq27_b336_1832_1944_097 xxxEND_PAGE:deq27_b336_1832_1944_098 xxxEND_PAGE:deq27_b336_1832_1944_099 xxxEND_PAGE:deq27_b336_1832_1944_100 xxxEND_PAGE:deq27_b336_1832_1944_101 Bagreus Cellus xxxEND_PAGE:deq27_b336_1832_1944_102 Ui edtbaatt ; Z ‘ xxxEND_PAGE:deq27_b336_1832_1944_103 BF xxxEND_PAGE:deq27_b336_1832_1944_104 FERRIG CHLORIDE, FLOW METER SCREENS PUMPING 3 Be -—-FLOCCULATION CARBON DIOXIDE FLUORIDE ME INTERMEDIATE CHLORINE. z WATER TREATMENT PLANT CITY OF FLINT WATER TREATMENT PLANT xxxEND_PAGE:deq27_b336_1832_1944_105 xxxEND_PAGE:deq27_b336_1832_1944_106 xxxEND_PAGE:deq27_b336_1832_1944_107 xxxEND_PAGE:deq27_b336_1832_1944_108 Prysby, Mike (DEQ) sO .

City TAC Team First Meeting

Team, We have scheduled next Wednesday March 4th as the first meeting date for the City's Technical Advisory Committee. The meeting will be at City Hall at 2:00 PM and we will have a conference number available for those who cannot make it in person. I will be sending out an official letter along with an agenda but wanted to give everyone an opportunity to get the time and date on their calendar. Thank you all for your participation, Howard Croft Public Works Director City of Flint 1101 S. Saginaw Street Flint, MI 48502 PH# 810.766.7135 Ext.2043 [email protected] xxxEND_PAGE:deq02_b217_2888_3366_274 Rennaker, Joanne (DEQ)

FWD: (SDWA - FY15-122649-3715-CV) Referred to Region - Michigan

| 10/15/2014 | | | | SUBJECT: FWD: (SDWA - FY15-122649-3715-CV) Referred to Region - Michigan FROM: [email protected] TO: [email protected] CC: 10/14/2014 9:07 AM xxxEND_PAGE:deq04_b301_4071_4473_193 HQ LEAD NUMBER: FY15-122649-3715-CV SUBJECT: Referred to Region - Michigan FROM: [email protected] TO: Name: Jan Burgess Address: 720 Commonwealth Ave City: Flint State: Michigan Zip: 48503 Phone: 810-235-6530 Alleged Violator's Name: City of Flint Alleged Violator's Address: 1101 S. Saginaw St. Alleged Violator's City: Flint Alleged Violator's State: Michigan Alleged Violators Zip: 48502 Tip or Complaint: Earlier this year, the City of Flint, Mi changed its water supply from the City of Detroit [Lake Huron] to the Flint River. This river has a very long history of pollution. Since this change, our drinking water has tripled in cost and the quality varies daily. Some days it smells like an over-chlorinated swimming pool; other days, like pond scum. It often is brown in color and frequently has visible particles floating in it. We've been under several boil water advisories due to e-coli contamination. Just this morning our local paper reports that General Motors Engine plant has shut off Flint River water to the plant due to the over-chlorination and the fears that the water will cause corrosion. http://www. People in Flint have had to resort to buying bottled water or having purification systems installed in their homes. Some residents have even had private wells dug. The water is not safe to drink, cook or wash dishes with, or even give to pets. We worry every time we shower. The City of Flint is still very economically depressed and most citizens cannot afford to do anything other than use the river water. Many of them have NO water at all due to the extremely high water bills. There is reasonable suspicion that reports have been falsified. Some residents have had water tested privately and the results are not even close to those reported by the City. Calls to the City and State have resulted in no action whatsoever. Violation Still Occurring? Yes State DEP/DEQ/DEM Notified? No 10 xxxEND_PAGE:deq04_b301_4071_4473_194 Rennaker, Joanne (DEQ) v

Fw: Joint Evaluation Documents for March 15, 2011

| talked with Dennis Wychocki, who is the R5 Water Division MI Program Manager for all the water programs in MI. He has been forwarding information to Laura Smith for distribution. | just want to make sure your division is getting the applicable information for the Joint Assessment to be held Thursday March 15 at 1pm CST as a video conference. Ground Water and Drinking Water will be discussed first. | have also attached the Joint Evaluation Assessment document | prepared for the Michigan drinking water program. If you have questions, please contact me. Jennifer Kurtz Crooks Michigan Program Manager Ground Water and Drinking Water Branch U.S. EPA, Region 5 77 West Jackson Chicago, IL 60604 (312) 886-0244 (312) 582-5853 (fax) [email protected] Draft Agenda Michigan Department of Natural Resources and Environment & Region 5 EPA Program Evaluation March 15, 2011 xxxEND_PAGE:deq26_b023_0330_0333_1 Meeting Expectations: The meeting will provide MDNRE and Region 5 management with the opportunity to jointly assess program progress. The desired outcomes of the meeting are to improve teamwork and communications, celebrate the successes that have been achieved to date, identify specific actions where performance may be improved. Meeting Preparation: Prior to the meeting, Region 5 management is expected to contact their MDNRE counterparts and discuss how programmatic issues will be presented. MDNRE and Region 5 management are mutually accountable for developing a coordinated presentation rather than two distinct discussions. Tuesday, March 15, 2011 Location for Meeting: TBD 1:00 Large Group Gathers: Introductions and Welcome 1:10 Program Direction, Priorities, Budget Issues [Tinka Hyde / William Creal / Liane Shekter Smith] 1:30 Joint Assessment on Program Commitments and their Status along with Performance Highlights, Areas of Improvement and Budget Issues Ground Water & Drinking Water [Thomas Poy /?] Wetlands & Watersheds [Peter Swenson /?] Monitoring / Water Quality Standards [Linda Holst /?] NPDES Program Permitting and Compliance [Kevin Pierard /?] Enforcement & Compliance [Dean Maraldo/?] Grants [Debbie Baltazar/?] 4:20 Review and Wrap Up 4:30 Adjourn * All times are Central Standard Time. onnee Forwarded by Jennifer Crooks/R5/USEPA/US on 02/22/2011 10:43 AM