MEDIA ADVISORY: Flint River Water Transition Event
- From
- Edward Koryzno
- To
- Richard Cline , Mathieu Duba , Drew Vandergrift , Robert Widigan
MEDIA ADVISORY:
City of Flint Transition to Flint River Water Ceremony
WHERE; Flint Water Treatment Plant, 4500 N, Dort Hwy, by Stewart Ave.
WHEN: Friday, April 25, 2014 at 2:00pm
Description: The City of Flint is holding a ceremony tomorrow to officially begin the
transition to use of the Flint River by shutting the valve to the ititake pipé from Detroit,
The DEQ has given Flint final authorization to begin water
distribution from the Flint Water Treatment Plant, City, Genesee
County, and Michigan Department of Environmental Quality officials
will be on hand to witness this historic event and answer media
questions,
xxxEND_PAGE:treasury02_b4_231_338_009
000240
-dason Lorene
Public Information Officar
Cily of Flint
(810) 237-2039
| p.co
xxxEND_PAGE:treasury02_b4_231_338_010
000241
Darnell Earle Payne Walling
ICMA-CM, MP. Moyor
Emergency Manager
Jason Lorenz
Public Information Gfficer
(810) 237-2039
jlorenz@cityofflintcom
For ltimediate Release
City of Flint Officially Begins Using Flint River
as Temporary Primary Water Source
Flint, Michigan — April 25, 2074 — For the firsi lime in fifty years, ive Gity of Flint is usina
the Flint River—part of the Saginaw River watershed—as a primary water source for
clty residents. Today the valve to the pipeline from Detroit was closed and the Flint
River officially became Flint's Water supply. The temporary switchaver is scheduled to
suppart the sily’s primary water needs forthe next two years While construction of the
forthcoming pipeline from Lake Huron is completed by Karegnondi Water Authority.
Officials from the City of Flint, the Genesee County Drain Carmmission and the Michigan
Department of Environmental Quality were all on hand to witness the historic event.
The Flint River was once the primary source of water for city residenis up to the
1960s, Over the past 40 years, it has provided water to city residents as a back-up
to water provided to us by Detroit. During our partnership wilh Detroit, Flint has had to
transition to the use of the Flint River for residential water on a few different occasions,
With the most recant temporary switchover happening in 2009. Each temporary stint on
local water proved iliree things to city employees and residents alike: That a transitiori
to local river water could be done seamlassly, and that it was both sensible and safe for
us to Use our own Water as a primary water source in Flint.
-CONTINUE—
City Hal)
(701 S. Saginaw Street - Flint, Michigan 48562
§10-766-7346 FAX? S1-746-7258 WAVY CIES OFT Lette
xxxEND_PAGE:treasury02_b4_231_338_011
000242
Darnell Earta Daye Walling
loma-cm, pied Mayor
Emergency Manager
Even with a proven track fecord of providing pariectly good water for Flint,
there still remains lingering Uncertainty about the quality of the water. In an effori
todispel myths and promote the truth aboutthe Flint River and its Viability as
a residential water resource, there have been numerous studies and tests conducted on
its water by several different independent organizations. In addition to What has been
found in independent studies, it isalso the responsibility of the City of Flint Water
Service Center to continually test the water provided to city residents. Michael Prysby
of the Michigan DEQ Office of Drinking Water verified that “the quatity of the water being
pul cul meets all of our drinking water standards and Flint water is safe to drink,”
Far nearly 10 years Mike Glasgow has. Worked in the laboratory at the City of Flint
Water Service Center. He has run countless tesis on our drinking water ta ensure its
safety for public Use Mike has not only conducted tests on water provided to us by
Detreit, but also on local water from nearby rivers, lakes and streams including the Flint
River. When asked if over the lasi decade if he has seen any abnormalities of major
concer in the water, his response was an emphatic, “No.” In his words, “there has been
nothing seen that was of major concem," during his angging tenure working in the lab,
“The tests results have shawn that ourwater is not only safe, buf of the high quality that
Flint customers have come to expect," announced DPW Director Howard Croft, “we are
proud of the end result.”
Apart from the water plant's devotion to ensuring that our water fs good, Flint is doubly
blessed in having the Flint River Watershed Coalition as a separate organization
—CONTINUE—
City Hall
) 101 §, Saginaw Strent - Flint, Michigan 48502
3) 0-766-7346 FAX: 810-766-7218 © wyweeilyofflini com
xxxEND_PAGE:treasury02_b4_231_338_012
000243
Dernalt Earle: Hayne Walling
1CMA-CN, MNP. Mayor
Emerygoncy Monoger
dedicated ta monitoring the overall welfare of local bodies of water, overseeing more
than 30 different nearby locations. Rebecca Fedewa has been direclor of the walershed
caalillan since 2008, By virtue of her passion for her work and her posilion on the board,
she |s very conversant with the condition of the Flint River, In her words, ‘The Flint River
is Increasingly healthy, sand completely sulfable as a drinking waier
source." Fedewa and FRWC are working closely with the city “to mianitor flaws and
habitats beiween the intake and the Waste Water treatment plant to ensure there are
minimal to no impacts to the overall heatti of the river.“
FRWE alsa invites city residents to be a part of their monitoring exercises during
this spring in order “fo gain firsthand knowledge in the health and vitality of our Flint
River.” Mayor Dayne Walling invited everyone at today’s event to toast to Flint's water.
"Ws regular, good, pure drinking water, and it's righi in our backyard,” said Mayor
Walling, “this is the first step in the right direction for Flint, as we take this monumental
step forward in controlling the future of our community's most precious resource.”
—END—
; City Hall
L101 S, Sagmmaw Street - Flint, Michigan 48902
310-766-7346 FAR, B10-766°7218 — wory-cityo Minicom
xxxEND_PAGE:treasury02_b4_231_338_013
RAFTELIS
*
Hie 4 TOM awe
y
Rate Stud
ye
Wa
nad:Wa
Fi
201
Jun
eport|
“Water.a
A
a
2:79,
nal R
xxxEND_PAGE:treasury02_b4_231_338_014
000245
TABLE OF CONTENTS
1. EXECUTIVE SUMMARY .....ccccccccccsceseeee Jetiseie EES ae OT ny |
7.1 BACKGROUND OF THE STUDY he!
1.2 ADEQUACY OF EXISTING WATER AND WASTEWATER REVENUES .........ccu0 x
1.3 WATER AND WASTEWATER FINANCIAL PLANS wad
1.4 COST OF SERVICE STUDY AND WATER AND WASTEWATER RATES......-0-rere0s 4
1.5 TRANSITION FROM DWSD TO KWA 6
4.6 WATER AND WASTEWATER UTILITY OPERATIONS 4ND BEST MANAGEMENT
PTR A eo FR Eada xe veceasbyecessv eb ties sndthanpemnerssGnupsasoe dndsvajesesussvuvin dgracbadaniy ua duis rnbapstiSWaTaNPr pied {eves TO
2. INTRODUCTION AND STUDY OBJECTIVES........., abesdatarivee 4 2
2.1 INTRODUCTION ...,.csseesee Fa smmesttissdis "
SFB TS BUOY OB eis IVES cise iccssssspenmrvees ensvonnibges 12
3. WATER AND WASTEWATER UTILITY FINANCIAL PLANS. ........012
3.1 THE FINANCIAL PLANNING PROCESS.) ..ciuses WaAcaasbia Hitbna RINAAWTIGeuDATCNEeA bom ONES 12
3.2 WATER UTILITY FINANCIAL PLAN. 13
2.2.1 Forecast Water Units of Service and Revenue at Existing Rates...
3.2,2Forecast of Water Operation and Maintenance Expenditures ,
3.2.3Water Utility CIP and GIP Financing...
3.2,4Water Gasti Flow Forecast ......ceenes WAdOt a Waxenemnegpoennn teens ‘
3.3 WASTEWATER UTILITY FINANCIAL PLAN, itso’
3.3.1 Forecast Wastewater Units of Service and Revenwes at Existing Rates... 6 54
3.3.2Forecast Wastewater Utility Operation anti Maintenance Expendltures ......cssesse 40
B,S.SWastewater Utility CIP atid CIP Fimancdng ee, sesiyy AZ
3,3.4Wastewater Cash Flaw Forecasts... den nanaacr tt cikeavabclresansus sone SS
4. WATER UTILITY COST OF SERVICE STUDY dT
4.1 WATER REVENUE REQUIREMENT FROM RATES 4?
4.2 WATER REVENUE REQUIREMENTS BY CUSTOMER CLASS 4g
4.2.1048M Allocation to Function Categories OO
4.2,.208M Allacation to Cost COMPOMEMES iecorcerseeeerseeee
4,2,3Capital Cost Allocation to Funtétional Companents........ ioveababviad
4.2 4Capital Cost Allocation to Cost Component «63
4.2.5Non-Rate Reveniie Allocation to Cost Component... ~§3
4.2.8Determination of Maximum Day and Hour Peaking Factors... SA
City of Flint
xxxEND_PAGE:treasury02_b4_231_338_015
000246
4.2.7 Calculation of Units of Service Sie
G2, BU ei Cost of Service i.e citi hla tinct Sa
4.2.9Revenae Requirements by Customer Class .........., 7
MS’ MYA TER FATE DESIGN a cesescarsescusesetce te ID
4.3.1 Volumetric Rate Calculations OO
4,3.2Fixed Charge Caloulatlois........
44.3Summary of Existing and Forecast Water Rates
43, AProjected Residential Water BUNS .. sera seer OB
WASTEWATER UTILITY COST OF SERVICE STUDY. *
6.1 WASTEWATER REVENUE REQUIREMENT FROM RATES .............. ane
5.2 WASTEWATER REVENLIE REQUIREMENTS BY CUSTGMER CLASS ....... cece 69
5.2,108M Allocation to Function Catagories pesipimeoiapehig Oe
5,2. 208M Allocation to Cost Camm PonBits ....-crncaeeernnercen — ipaieeenieianisibtcecet
5.2.3Capital Cost Allocation to Functional Components .....—ncernreernrnene sarah etetnatioectonsanieed D
6.2.4 Capital Cost Allocation to Cost COMmpOme|ntts EM
5.2,5Non-Rate Revenue Allocation to Cast COMpPONeNts —..ccarecwenenrr epcguaatatinnt L
B.2.SPlant Satan ce Araalysis TE
§.2.7 Calculation of Units of Service sun
5. Z.BUnit Cost Of Service... ebb ins seeoniowareuiiiniba kD
5.2.9 Revenue Requirements by Customer Chab, Gi reduvn stan vised neebccacessytithcewedisy areotadien ttle 74
5.3. WASTEVVAT ENC RATE DESIGN i sessta sors yersevesiniecd sure 75
5.3.1 Volumetric Rate Cain ulations nies pachshinchviapianeiiin te
5.3,2Fixed Charge Calculations... rssrresetesnes See eet are er een eet eee aasvoneeseieabaanss TO
5.3.3Summary of Existing and Forecast Wastewater Rates... asc BO
5.3,4Projected Residential Wastewater Bills cc BO
DISCUSSION OF BEST MANAGEMENT PRACTICES (BMP).,.,,,,....83
6.1 FINANCIAL PROFILE..........
6.2 DEBT PROFILE RELATED...
6:3: OPERATING PROFILE RELATED 5.
reer eterer etter eoriiit iii
reer serene
Water and Wastewater Rale Study
xxxEND_PAGE:treasury02_b4_231_338_016
000247
This page intentionally left blank to facilitate two-sided printing,
City of Flint
xxxEND_PAGE:treasury02_b4_231_338_017
000248
4
EXECUTIVE SUMMARY
ti
BACKGROUND OF THE STUDY
On November of 2015, the City of Flint ("City") engaged Raftelis Financial Consultants ("REC") to
perform water and wastewater utility rate studies: Tha scape of services Included the following:
3.2
Evaluate the adequacy of existing water and wastewater revenues ta meet each Utility's
projected revenue requirements
Develop comprehensive water and wastewater financial plans based on sound financial
Mahagement practices fora | 0 year forecast period
Determine water and Wastewater rates which adequately recover the cost of operating the
water and Wastewater utilities under the existing rate structures and provide alternatives
based on.a comprehensive cost of service study
Analyze the impact of transitioning from the ase of purchased potable water from the
Detroit Water and Sewerage District {“BWSD") to the treatment of raw water from the
Karegnondi Water Authority (“KWA"}.
Review the City's water and wastewater operations in comparison to Best Management
Practices criteria,
ADEQUAGY OF EXISTING WATER AND WASTEWATER REVENUES
Charts ES-1 and 2 below summarize our ‘conclusions with respect to the adequacy of water aid
Wastewater reyenu# at existing rates; As the charts indicate, beginning in FY 2015, water and
wastewarer utility revenues are insufficient te recover tach utility's revenue requirement Key
drivers uf this disparity are:
Amarked decrease in tilled usage, the cause of which is currently being evaluated ly
RFC ulider a separate contract.
A sormal pattern of declining per customer usage for both utilities overall due to
conservation, efficient appliances, etc.
Increases in utility revenue requirements associaced with the financial plans lactuding
operating cost inflation, capital improvements and policies. which support the sound
financial management of each utility in accordance with best manapeniant practices.
Consequently, the preposed increases in rate revenue are pecessary to ensure aach utilicy can
adequately furd its operation and maintenance expenditures, make payments on existing debt
seryice, provide funding for needed capital improvements end ensure adequate operating reserves:
Water and Wastewater Rate Study | |
xxxEND_PAGE:treasury02_b4_231_338_018
000249
ES-1; Water Utility Revenues at Existing Rates
$50,000,000
$45,000,000
$40,000,000
$35,000,000
$30,000,000
$25,000,000
$20,000,000
515,000,000
$10,000,000
$5,000,000
S55 Total Gross Revenue Requirements
——— Grand Tote! Water Revenue at Existing Rater
——— Proposed Rate Revenue
ES-2: Wastewater Utility Revenues at Existing
Rates
340,000,000
$35,000,000
$30,000,000
$25,000,000
$20,000,000
$15,000,000
$10,000,000
$5,000,060
S$
FY 7014 Fe 291s FY 2016 FY 2017 FY 2018 FY 2019
tsa) Total Gross Revenues Requirements
——— Grand Total Wastewater Revenue et Existing Rates
—- Proposed Rate Revenue
= | City of Flint
xxxEND_PAGE:treasury02_b4_231_338_019
000250
1.4 WATER AND WASTEWATER FINANCIAL PLANS
Tables BS-3 and ES-4 below summarize the proposed water and wastewater financial plans and
rate revenue increases for the first'5 years of the forecast periad,
The financial plans and proposed increased in rate revenues are driven by the following factors:
* Inflationary increases in O&M expenditures (or both utilities
* For the water titility:
o Decreases in revenues associated with the cessation of service to Genesee County
© Decreases in O&M expenditures associated with an elimination of DWSD water
purchases
o Tnereases in C&M expenditures associated with transitioning from backeuw to
primary operation of the Flint WTP
oO Increases in capital expenditures associated with improvements to the Flint WTP in
Preparation for the treatmeny of raw water from KWA
o Increases in debt service associated with Flint’s share of projected KWA debt service
+ Necessary cash funded recapitalization of wastewater utility assets
* A build-up, for each utility, of operating reserves equivalent to 90 days of projected O&M
expenditures acd debi-service payments, the minimum, according to Anancial management
practices ("BMP"),
ES3: SUMMARY OF WATER AND WASTEWATER FINANCIAL PLANS
Fon
Mate vu a a Se Fn red
Nave wv thar ae erating (ee
sities | Rast t2feisrs = wmins &
(Haim + Aw SNe ee
ese
i ‘
AUgI nd) Me eeive Hm Hele liisreeer eo '
ul LS ws F sorte Ss eran ¢
'
’
| ee st | oe a | a eee er |
{earn serben TEN PHP waa = JGR = Tee F varinn = Tee ara
(bara
aan es + aoc q2MOn F Dawe 4 ne, 8 TT ek
orzo § Wrest ihren = ‘ofan & Woon wWheag (36
fecal ‘ Cer 797 EF Expekt ES FOIE snsen 4 324,002
£ i WaT a
os
[Craw Vite Wnstewstar avenue at Bo cieg Mates ‘
JAMad banat The veny Ream ively liverreet !
CNM (toa Anrwmruies i
he rst on in tor dense Ftc Lia
are bial
(Goi AEVEwUE TEOUINEMENTE ©
wis & nm
< f 2,033,208
gasore 3 som
cs
sme eer = mea rn
ame 3 oar = los 8 0e3.090
some Amo £ eam F 2024.
> 1.
Thin =
sarta & saasiyans Tas) &
50000 & vO &
ntsarsth & aoe kab)
THF NT ©
Water and Wasiewaler Rate Siudy | 3
xxxEND_PAGE:treasury02_b4_231_338_020
000251
ES-4: Annual % Rate Revenue Increases
F¥ 2015 PY 2g16 FY2037 FY 2018 FY 2029
Water Ublity Wastewater Utility
As indicated in the previous section, water and wastewater uillty revermas at existing rates are not
adequate to recover the projected costs: gach utility will incur over the forecast period.
Consequently additional rate revenue will bs needed to ensure adequate récovery of each ucility’s
revenue requirements.
{4 COST OF SERVICE STUDY AND WATER ANG WASTEWATER RATES
Table ES-5 below summarizes the results of the water and wastewater cost of service studies, The
customer classes included are those which are recognized in the City's existing customer
information system ("CIS"). While the City does not currently have etther a water or wastewater
rate structure which recognizes these customer classes, rates by customer class have been
calevlated and are included as appendices A and B to this report. The totals for each customer class
represent the contribution of that class to the overall costs of each utility. This is based on rhe
allocation processes described in sections 4 and 5 of this report.
Given the transition fram KWA to DWSD the City will not be making any rete structure changes at
this time. Itis our opinion that che current water and wastewater rate structures are reasonable.
The declining block water rates generally recognizing the fact that higher volume customers (Je.
large commercial and industrial) contribute less to peak demand, and overall water utility costs.
Additionally, the relatively high propertion of fixed charge revenue recovery provides a less
cimarically variable revenue stream, which given that the majorlty of the urillty's ensts are fixed, is
entirely appropriate.
9 | City of Flint
xxxEND_PAGE:treasury02_b4_231_338_021
000252
ES-5: SUMMARY OF COST OF SERVICE STUDY RESULTS
es rT
CUSTOMER CLASS
Allocated Cost of Service
18,345,672 16,412,799
15,283,704 13,378,697
370,646
Total Outside City Residential COS
Total Outside City Cammereiallindusinal COS
Total Outside City Lawn OGS
Total Outside Clly COS
Total Systam Gost of Senice
Tables 5-6 and ES-7 summarize the projected fixed and volimetric rates for the first 5 years of the
forecast period, given financial plans and rate revenue incraases proposed above. Far every dollar
uf rate revenue generated by each utility appraxmately 2.66 is derived from Volutjetrit charges
and $,34 js derjyed Tom fixed charges.
Ibis typical For water and Wastewater utilities to design fixed charges Which recover, at a miniramm,
the costs of métér reading, billing and collection and custamer service, Additonally, hxed charges
may also relate to.fixed investment in utility assets associated Wath providing service which is
available at all times regardless of usage levels by City customers, These costs, known as readiness
(o serve costs, have also been incorporated into the water and wastewater fixed charges.
Volumetric rates recover the variable costs associated with operacing the water and wastewater
utilities, For the water uulity variable costs are asseciated with water treatment, transmission and
distribution, pumping, and storage and are driven primarily by the design requirements associated
with peak water usage. For the wastewater utility variable costs are associated with wastewater
treatment, collection, and pumping, and are driven by the wastewater yolume and strength,
Water and WastewaterRate Study | 6
xxxEND_PAGE:treasury02_b4_231_338_022
000253
Peni! S Increcew bn Rake Ravenuea
Varn) inside City Al) Clenene
fade Ciry Block § @35 CCF jscer) 5 7a
nse City Breck 2 SMM COF OCF) § a
Viti Clty Biel 3 abreROI OCF (OCF) 4 4.79
ou! Oued de City Ail Clanvon
‘Cuistte Cy Bleek | oascor (siccry | 3 ues
Oviside iy Block ¥ MDM CCR SICK) oS “OTF
‘Mnside Chy Block 5 ow 200CCr OTFA § ae
ANtusl % Increase [n Rate Neyonios
Tomnt indie City Al Claes
Tota) Guede City All Clagsoe
4 City of Fim
xxxEND_PAGE:treasury02_b4_231_338_023
000254
ro meee
omer
es hoes
eo p20
vue
dese?
yeure
ge iee
00 it's
was
raters
vonez
pray
ogee
OC ote
wee
ocnet
Of Po
we
aaa pana aa
spews.
Se
Ce
ee ore en or me oe ey
Rteise
svar
rope
1 L00'»
efavoe
is
os oe |
um
me aie
sy FY
dort
ane
4o0
ole
ua
ua
a8
ordt
weet
ip ee
Great
mice
weet
mith
ice
Hens
1NGLE
am
w't5
ter
wn
re'eay)
Weis
deere
WheREL
icone
#2 5u6
al
epee
6S Our
Abba
va ved’
TLTANT
was!
witee
al tetetttatatntal
nen he ne nee
4 | Ape ary oyemaise ad plterejenh
ee a ak
it ee or nr me re
Ce ed
eee eee eee
aan
io
ye ade
ese
dae
We ot0r
ite
Lise
(oats
sagt
Sutsey
92009
Wwreee
sere
wee
nw
Some
e400
Tran re
ee re
— EPSR yHtD GFL gS PART UWA
SS9uVHO O3x14 HAL
ree
Ole
ore
oeee
moe
wo tee
Ae snes
ye seit
Mi aba"
daeace ® some
Hevge's & PS aeht
OF hee
Leite
ae Spb
ve a
wey
a
wy ae
ed
+e
weet
Pi bac's
a's
eb cahr
St ons
wey
tee)
ie
Sr dee
ate
aa aoe
od
“Varn ewewe
ene we
aD
*
aft
at
7
4
at
6
are
-t
wt
ae
Hae mara 3 42 toa ENE
=
the
«
ey
ae
wenepe ay 413 APS)
Az
tt
atl
oF
a
“
”
at
wes
enverpey Alc semi
xxxEND_PAGE:treasury02_b4_231_338_024
000255
1.5 TRANSITION FROM OWSb'TO KWA
A key aspect of this study involved analyzing the impact of the anticipated Apri) 1, 2014 transition