Good afternoon, Dan.
Below are my comments on the Project Plan. We ask that you respond to (and/or resolve) these items by
January 11th.
#1) — Lunderstand the meter replacement map in Appendix B shows the municipalities where new meter
installation will take place while the Figure 1-1 shows the actual service area for the county
system. Will the entire DWRF project contain meter installation in all 10 townships (i.e. Clayton,
Davison, Flint, Flushing, Gaines, Montrose, Mt. Morris, Richfield, Thetford and Vienna) where new
meters will be installed? We need you to provide a map which not only shows the municipalities where
new meter installation will take place for the entire DWRF project, but also identifies the locations of
the proposed five (5) base stations for the entire DWRF project.
xxxEND_PAGE:deq16_b5_0892_4900_2420
In answer to the first part of the question, yes, we will be installing meters in all 10 of the townships. In answer
to the second part of your question, there is a propagation map in Appendix B showing the locations of
the seven towers in the original project. We have installed the base stations at Beecher Tank and Houran
Tank. If you need a new map please let me know.
#2) Are there no capital improvements and/or replacement costs over the 20 year planning period for
keeping the Manual Ready System? Are the no replacement costs over the 20 year planning period to
switch to the Meter Replacement and AMR/AMI System?
i'm not sure what you mean by " Manual Ready System" ?
No, there are no replacement costs anticipated for the 20 year planning period. The new meters, endpoints and
base stations have a 20 year life expectancy.
#3) a. Lunderstand the entire DWRF project has anticipated impacts to the state regulated resources of
floodplains, inland lakes and streams, or wetlands. Confirm.
We do NOT anticipate any impacts from the Meter Replacement and AMR/AMI Project.
b. Did you obtain clearance from SHPO? We need a copy.
SHPO letter is in Appendix J and we received no response
#4) a. For the full construction footprint for the entire DWRF project (new meters and antennas), do you
conclude that it is in an urban area where no suitable wildlife habitat for state species is present or that
the construction work is limited to existing structures? If so, contact with MSU-MNFI can be
waived. Otherwise, a Rare Species Review request must be submitted via the MSU-MNFI website
(bite //motl any. mou cfm) to generate a letter from MSU-MNFI staff
summarizing their findings.
Yes, we conclude that The Meter Replacement and AMR/AMI Project is an urban area where no suitable
wildlife habitat for state species is present and that the construction work is limited to existing
structures.
b. For the full construction footprint for the entire DWRF project (new meters and antennas), do you
conclude that it is in an urban area where no suitable wildlife habitat for federal species is present, or if
construction work is limited to existing structures and in turn the project will have “no effect” on any
federally listed species? If so, contact with U.S. FWS can be waived. Otherwise, the U.S. FWS
xxxEND_PAGE:deq16_b5_0892_4900_2421
#5)
must be followed.
Yes, we conclude that Meter Replacement and AMR/AMI Project it is in an urban area where no
suitable wildlife habitat for federal species is present, and the construction work is limited to existing
structures and in turn the project will have “no effect” on any federally listed species.
Are any of the new antennas for the DWRF project located within 5 miles of any licensed airport? If so,
how much height will the new antennas add to existing water towers or cell towers? If it is significant,
you may need to contact MDOT Bureau of Aeronautics.
The new antennas heights are not significant.
#6)
#7)
#8)
#9)
Will there be any service interruptions? Yes there may be short service interruptions. . If so, what
should users anticipate? We have prepared a letter and a FAQ that will go to each customer outlining
the process. What hours/days of the week will construction take place? Project work will take place
Monday through Saturday during daylight hours with special appointments at other hours to meet
customers needs. In a 2"° Quarter schedule, we expect construction to begin by May 2016. Per our
telephone discussion you confirmed that we are anticipating a 3rd Quarter Schedule. Based on that we
would anticipate construction to begin by July 2016, In turn, when would construction completion be
expected? We would anticipate construction completion in July 2018.
Will construction result in traffic congestion, limited driveway access, and/or noise? No. If so, describe
mitigation. Any dust/soil erosion? No. Will there be any excavation? No. Will a soil erosion permit not
be necessary? A soil erosion permit will not be necessary. What permit(s) will be needed for
construction? We do not anticipate that any additional permits will be necessary.
Will there be an increase to user rates to repay DWRF loan debt? If so, what is the estimated increase to
the annual user rate for the typical residential customer? If not, how will DWRF loan debt be
repaid? Page 34 leaves this issue unanswered. Note that while we wait for EPA to decide if the project
must be re-bid, we will continue use the $5.4 million cost estimate. No, there will not be an increase in
the user rate for the project. The existing rates are sufficient to repay the DWRF loan. See Page 34, the
last sentence under Section 3.4. Also see the User Rate Analysis submitted on 12-3-2015.
Below are selections from the November 2010 EA-FNSI for Genesee County DWRF #’s 7340-01 and
7341-01. Is this information still accurate? Identify any updates in your response.
“..Genesee’s water system service area consists of approximately 145,000 residents inside the county.
as depicted in Figure A, along with over 8,000 residents outside the county in Birch Run (village and
3
xxxEND_PAGE:deq16_b5_0892_4900_2422
township) in Shiawassee County to the west and New Lothrop in Saginaw County to the north. The
Genesee County Drain Commissioner’s Office is responsible for the operation and maintenance of the
system. Potable water from the Detroit Water and Sewerage Department (DWSD) is purchased by the
city of Flint (Flint), which sells a portion of its supply to Genesee. The actual source of the DWSD
water supply is Lake Huron in close proximity to the city of Port Huron. After treatment at DWSD’s
water treatment plant the potable water routed for Flint and then Genesee travels through a single 72-
inch-diameter water supply main courtesy of the Imlay Pump Station.”
“Genesee ’s water system (Figure B) has around 116 miles of transmission and distribution water main ranging
in pipe diameter size from 6-inch to 72-inch with approximately 98 percent ductile iron, less than 2 percent
cast-iron, and less than 1 percent concrete pipe. Genesee’s other water system components include 6 major
pump stations, 21 storage facilities, and 1 standpipe.”
See Revised below
“ .. Genesee ’s water system service area consists of approximately 145,000 residents inside the county. The
Genesee County Drain Commissioner's Office is responsible for the operation and maintenance of the
system. Potable water from the Detroit Water and Sewerage Department (DWSD) is currently purchased by
Genesee County. The actual source of the DWSD water supply is Lake Huron in close proximity to the city of
Port Huron. After treatment at DWSD’s water treatment plant the potable water routed for Flint and then
Genesee travels through a single 72-inch-diameter water supply main courtesy of the Imlay Pump Station.”
Genesee County is a member of the Karegnondi Water Authority (KWA) which is currently constructing a
source water supply system from Lake Huron to Genesee County. Genesee County anticipates switching to
KWA water in 2017-2018.
“Genesee’s water system (Figure B) has around 543 miles of transmission and distribution water
main ranging in pipe diameter size from 6-inch to 72-inch with approximately 98 percent ductile iron,
less than 2 percent cast-iron, and less than 1 percent concrete pipe. Genesee’s other water system
components include 6 major pump stations, 21 storage facilities, and 1 standpipe.”
#10) We need a list of 40 mailing addresses where water bills are actually sent (i.e. we do not want to our
postcards returned to us by USPS) which are for customers that will receive new meters/be located near
new antennas for the DWRF project.
We have attached a list of 40 active accounts with both the connection address and the billing address.
Let me know if you have any questions. Thanks.
xxxEND_PAGE:deq16_b5_0892_4900_2423
Jonathan M, Berman
Senior Project Manager, ERA
Michigan Department of Environmental Quality
Office of Drinking Water aad Monicipal Assistance
Revolving Loan Section
Bermant
Phone #: 517-284-5400 (note new number)
Fax #: 517-373-4797 (note new number)
Constitution Hall ~ 4" Floor South (note new floor location)
$25 W, Allegan
Lansbig, ME48933 for deliveries}
P.O. Bos 30241
Lansing, ME 48909-7742 Gnailine}
DWRF website: wyw inichigan
xxxEND_PAGE:deq16_b5_0892_4900_2424
90T8P
yOeuy NNV
L8ET XOU Od
inns
M1OLSIa SLEE
ANtIS LHONSAV
OTHZ6E0OOO-Z] TY |
CLS60
SOIdV¥ GNVHS |
8 41S 3S LONOWLObA>
ANI
S N3GNIT SS7Z
SNOLLN10S SSINISNG ALINDILNI
OTTZ6E0000-2] OF |
L0S87
ANI
GY ATNYOL OL7P
ANI
ATMHOL OL77
NIVW LJveoulyY NYTIS1D OW
06696£0000-2] 6E
T4ci4
aNnvyund
801 XOB Od
inns
NONN318ZEE
NOINN LId3¥D YNITJOVS
oz696e0000-2| 9¢ |
E2887
ONISNV1 LSV3
8T@b XOd Od
ANIIS
'S N3GNI1 OSOE
O71 ‘AW 4 3GAZ 3 3DYOIO.
01696£0000-¢| Z€
60687
ONISNYT
OObOE XOB Od
inns
MATIN 0627
O71 ¥3LN39 TIVLIY LaSY3WOS IW.
otes6e0o00-z| 9¢ |
LOS87
ANII
YG JONVHDXI Zh7S
ANI
JONVHDXI ZHzS
AAC
02296£0000-¢| SE
OES6D
Sdidv¥ GNVYD |
aS NOSYALLV¥d OOES
AN
YSTIIW 8E0S
OTT NVILSISHD AIS
OZZS6E0000-2} 7E
£0587
inns
GY MATIN SLT
inns
GY MITTIN SZTH
DOSSV GTYOM JYNSIST
osts6e0000-z| ¢¢ |
LOS87
ANIS
SUG WuvdulY OZ0E|
ANINS
SUG WuVdul¥ OZ0E |
09 LNIWdINDI ODN
ogev6£0000-¢| Ze
L0S87
ANd
Yd AVGNOH Ter)
Ann
AVGIIOH T27p
ONIS¥I1 YFTIVYL SNOOD
OELEGEONOO-Z|
s0Tsy
yOeuy NNV
OO€ ALS AMd YSMOHNASIS J SOE,
inns
ADNWHOX3 S775,
ONIdNOYS SNOILNIOS LANYILNI
oave6eooo0-z[ 0¢ |
eevey
ONIHSN14
GY ONIHSN14 OSTS
ONIHSN14
ONIHSN14 O9TS
AddOHS WV3¥D 3918 Yvd ONIN
02626£0000-¢| 6z,
€0S8b
ANI
1S LYNOD MTZ)
ANI
THW TOTZ
ONIWGL
os9z6£0000-Z] gz |
Itsy
aTNA31138
GY ALYADOVH OO6ZT
inns
AWONOH TOTH |
O77 S4Sl¥dY3.LNJ HOVE!
o8zo6e0000-2| Zz |
‘8bS6r
SdIdVY¥ GNVHS |
ZAS ‘ISHI1PS 68)
ANII4
S AMH MIONITIVE STEZ
LN3WdINDI TWOIGIW LYVH
0€€68£0000-| 9z,
cESsy
inns
GY VNNNYOD 62TP9|
inns
YNNNYOD 62TH
YL HSVM YV2 8 38017 NIND DVIS YINDIHD
ozge8e0000-2| Sz |
Ovg8y
ONVIGIW
AS NIVIN J EEE)
ANI
S N3GNIT TOSE
NY TYDIINFHD
05528£0000-| pz.
L0S87
ANI
YG AVOIOH 8977)
ANI
bud AVGIOH 8977
SIDIAYIS GILIGIdXA XLV
O90PSEO000-Z} €Z
eLpsy
IID ZLYVMS
GY S13 6EZE
AIAN ZLYVMS:
S SIW13 6EZE
09 344509 JGISIUIS
otvoseooo0- zz |
TESsy
ANI
SEZOTE XOd Od
NII
ONIHSN14 ELSE
ONI SN3HD LI L4VYDGOOM
OTvSZZ0000-Z|
68087
Naga
GY SNIHdILS SZZZT
ANI
GY AFNYOL LPEE
O71 LYOdSNVYL TWHLNID
0¢gzto00c0-2] 02 |
eersy
SNIHSN1S
1 ANNYG 209)
SONIHSNIS
YAAIY ZTOL |
D1v JOGIY YSAIY
ostp9zo000-rt| 61 |
TLEC-E€v8b
ONIHSN14
Yd JDYIWINOD 2907
ONIHSN14
JYINWWOD £907
S1LONGOYd ILFYDNOD WHLN3D
0¢95S20000-rT| QL
Ovpc-OT766
ANVAOdS
Ovpz XOd Od
ANI
MNOSY3ld T8b7
ALIMDV4 0/9 09 JYLL LNNOISIC
QSZSZZG000-FT} ZL
SSOb-vEBTS
aTANVG
SSOv XO8 Od
SONIHSN1S
A\NOSY3Id TOSS
ALIMILN-JT8VA¥d SLNNODIV IDS
ortszzoo00-rt{ 91 |
ELb?-€€v8pr
ONIHSN14
‘Id NOSY3ld 62VE
ONIHSN14
‘Id NOSY3ld Teve
ONIFDIANIS MVHS:
WZ68190000-bT| GL
ETbpC-EEvsy
ONIHSNTS
Id NOSY3Id 6Z7VE
ONIHSNTS
Id NOSY3Id TPbE
AYINVIB 335IOD
0268v90000-rT| FL |
bLbc-Eevey
ONIHSN14
T 41S 1d NOSH4ld 9SVE
ANI
AMA NOSYAld S/TH
LNIT4 40 SdOHS H31S4NW ASIN
08€8790000-rT| 1
9@bb-LOSBy
ANI
GY MYNIDVS S STES.
ONIHSN1S
NNY P9ove
O11 SALLY3dOUd ILVAS
GERPySC000-FT
s0ery
NOW
veMOL L33uLS NIVIN “S 90T
SONIHSN1S
A\NOSYAId 7579
ANVE LYN Lsuld
o9zeegoo00-rtl LT |
bossy
ANII
GY NOSY3ld TISED
ANI
M\NOSY3ld TISE:
ulvd3¥ OLNY SNO13G
0%26290000-rT| OL
ECET-POS8PD
ANI
YG NV100 0407
AN
NV10d 0407
WLIW 133HS NVYSIHDIN
ozozos0000-rt| 6 |
eersy
SONIHSN1S
Gy NOSYAId M EOS
SINYOIN LW
OND 9808)
NOISITI09 Jdtdd OLAV
oteoosco00-rt|¢_|
bossy
ANIS
ZT ALS AMH Y3ONITIVE N TST
ANINS
@ 31S YZV1d OID £0ve
O71 3SIHdYFLNI IMNSVINL
os000s0000-rt| 2 |
ESET-POS8PD
AN
JAY YNIGVS¥d M ZZbE
Ann
MYNIGVSVd ZZbE|
J91Vd YNHLYY
otzpssooo0-rt| 9 |
poser
inns
OND 6rbS:
inns
OND 6rbS)
QTYOM YaddOL SdITIHd
orezosoooo-rt| ¢_|
Ofvsr
NOINI4
4AW1NG NVILVHD ST
ANI
AMV NOSY3ld SZE
41V1S3 1V4¥ INIT Sf
ogv2to0000-rt| Fr |
SEET-POS8b
ANS
GY NOSYAId M OSOP
ANI
AM\NOSYa3ld OSOP
VZV 1d NOSYJId
osoztooo0e-rt| ¢ |
OEOTZ
AITIVA INNH
dy Wid Y3AV4d 90Z0T
AMA NOSYAld E9¢€
dNOYS LSYIGVOUE HIVTONIS
ozztto00000-rt| Zz |
ssouppy Suievy
358JPPY UOIIE90]
@WeN JaWOIsND
xxxEND_PAGE:deq16_b5_0892_4900_2425