Leigh Copen

Senior Executive Management Assistant at DEQ / DEQ

24

Emails

May 2012–Dec 2015

Archive range

24 emails found.

Requested items

Hi Leigh, Attached are the requested items. The Governor’s report is being finalized and will be posted to the shared drive shortly. You can check with Karen to find out when it is posted. Thank you! George George L. Krisztian Flint Action Plan Coordinator Laboratory Director Michigan Department of Environmental Quality Desk ph (547) 284-6715 Cell ph | xxxEND_PAGE:deq16_b3_0014_0687_627 Department of Environmental Quality 18-Point Partnering Plan After Action Plan Frequently Asked Questions will be ready by noon on November 16, 2015 ° First version complete — updated as needed School test data ° School reports to be expedited ° Steve Busch creates summary reports ° George Krisztian creates summary spreadsheets Blood exposure ° DHHS is lead on providing data Meeting with Mayor Karen Weaver ° Harvey Hollins lead - Dan Wyant, Jim Sygo, and George Krisztian to attend Messaging our Partnering Plan e Provide ongoing public updates regarding Governor’s 10-point plan . Continue emphasis on the availability of free testing for Flint residents ° DEQ’s Office of Environmental Assistance to direct the public to the Flint water Web site: www.migov/flintwater Sampling Protocol ° Establish alignment with the U.S. Environmental Protection Agency (EPA), Region 5, on sampling protocol Lead service line replacement ° Expand the Revolving Loan Fund directed at lead service line replacement ° Amy Epkey, Maggie Pallone, and Sonya Butler xxxEND_PAGE:deq16_b3_0014_0687_628 DEQ 18-Point Partnering Plan Page 2 8. 10. 11. 12. 13. 14, 15. 16. 17. Partner with EPA Dan Wyant —> Susan Hedman Jim Sygo —> Bob Kaplan Mike Prysby and Steve Busch —> Darren Lytle and Mike Schock George Krisztian —> Tom Burke DEQ’s Office of Drinking Water and Municipal Assistance (ODWMA) staff —>EPA, Region 5, staff (Jennifer Crooks and Tom Poy) Meet with Charles Stewart Mott Foundation to discuss Lead Service Line Identification Study Lead Education Program ° DHHS is the lead on Lead Education Program Moving Karegnondi Water Authority (KWA) forward ° Proactive meetings with KWA Participate actively with Flint Technical Advisory Council Utilize Joan Rose and Michigan State University water expertise Public outreach Flint Mayor Karen Weaver Genesee County Health Department Drs. Lawrence Reynolds, Eden Wells, and Matthew Davis Ministers Land Bank Legislators Citizens Outreach to schools ° EPA guidance on testing ° Work with State Superintendent Brian Whiston ODWMA staff to work on literature Make recommendations to EPA about Lead and Copper Rule Compliance Communication letter sent on November 9, 2015 ° Wait until after December 30, 2015 xxxEND_PAGE:deq16_b3_0014_0687_629 DEQ 18-Point Partnering Plan Page 3 18. Enhance coordination with health officials regarding personal health notifications of drinking water issues xxxEND_PAGE:deq16_b3_0014_0687_630

Flint Water Task Force Info

Good afternoon, Madhu asked that | provide you with bios for the Flint Water Task Force members. Please see the October 21, 2015, press release below that includes a short bio for each of the task force members. Please let me know if | may be of further assistance. Thank you. Hugh. Leigh"M. Copen Senior Executive Management Assistant to Madhu R. Anderson, Deputy Director, Econarnic & Strategic Initiatives Mary C. Goodhall, Organizational Excellence Coordinator Department of Environmental Quality S17 284 6702 | [email protected]

timeline

Leigh - can you give a copy of the draft timeline we updated to Liane and George....I forgot to get them copies today Madhu Madhu R. Anderson Deputy Director, Economic & Strategic Initiatives Michigan Department of Environmental Quality Phone 517 284 6702 | 517 290 9653 xxxEND_PAGE:deq15_b590_2095_2095_1

FW:.NEWS RELEASE: Gov. Rick Snyder announces Flint Water Task Force to review state,

To
Mary Thelen , Dan Wyant
federal and municipal actions, offer recommendations Importance: High FYI... It was released at 2:07 p.m. ugh 7 . Senior Executive Management Assistant to Madhu R. Anderson, Deputy Director, Economic & Strategic Initiatives Mary C. Goodhall, Organizational Excellence Coordinator Department of Environmental Quality 517 284.6702 | [email protected]

Flint Reconnected to Detroit Water System

nito www. clickoncetroll medium=emaiigutm cam Rosemarie Rosemarie Olszewski General Office Assistant - Executive Division Michigan Department of Environmental Quality Constitution Hall, 525 W. Allegan St. 6 Floor South Tower, Pillar P6 Telephone: 517-284-6700 Fax: 517-241-7401 xxxEND_PAGE:deq14_b0742_2548_2548_1

FW: FOIA request from Phelps - 6422-15

Maggie: The attached FOIA request has already been entered into the FOIA database. However, | did not realize the requester was a State Representative. Karen Shaler and JoAnne Rennaker (ODWMA-Lansing District) are working on this FOIA request. Please contact me or Karen if you have any questions. --Susan Susan Vorce, FOIA Coordinator Department of Environmental Quality 517-284-6889 or 800-662-9278 yorces@ michigan gov xxxEND_PAGE:deq24_b157_0395_0396_2

FOIA Reply Due by Noon on 9/16 - FW: 6525 - EXEC, ODWMA + Lansing Disrict - due: 9/16/15

Importance: High records for the subject FOIA regarding the “Flint lead in water situation” (see link to FOIA request, below). If you do have records, I'll need an estimate of the number of pages and how much time you spent searching for the records. Thanks! P.S. to Brad: I’ve already provided Mr. Edwards with the cost estimate to provide him with your statement to MLive, so | have that portion for Item 3 of this FOIA.

FOIA Reply Due 9/25 - FW: 6422 - EXEC, ODWMA, WRD + Lansing - due: 9/29/15 - extended

Importance: High By Faday Seaiemiber 25 please let me know whether or not you have responsive records for the subject FOIA regarding the city of Flint’s source of water (see link to FOIA request, below). If you do have records, I'll need an estimate of the number of pages and how much time you spent searching for the records. Thanks!

FW: 2014-023EQ Rules Package Submittal

Good moming! Please take thista Heather. Underthe new ormanizational stricture Dave isnow underMaggie and Heatheris doing miles. lam copying heron thismessage. Albough a measage and new executive division ow chart wento nt, twas not clearthat Heather wilnow be working forDave. A message wilbe going out soo, Thank you! leigh M. Copen Senior Exec nive Management Assista ni Suategic and Keonemie hifiatives ALT 284 6702 DEa.

2014-023EQ Rules Package Submittal

Good Morning Leigh, | will be running a hard copy package up to you today, attached is the electronic version. Thanks, Tracy Jo Tracy Jo Devereaux, Management Assistant to Liané J. Shekter Smith, P.E., Chief xxxEND_PAGE:deq18_b226_1675_1839_017 Office of Drinking Water and Municipal Assistance Michigan Department of Environmental Quality Constitution Hall, 4th Floor, South Tower, Pillar P8 525 W. Allegan Street Lansing: Migrigan 48933 517-284-6544 2 (ex, eres xxxEND_PAGE:deq18_b226_1675_1839_018

Administrative Rules - Parts 1 to 28 Supplying Water ot the Public ORR 2014-023EQ

Attached is the updated JCAR report and draft rules that had a change on page 8 (per Karen Shaler’s edits). | will run these hard copies back up before noon. Thanks, Tracy Jo- Tracy Jo Devereaux, Management Assistant to Liane J. Shekter Smith, P.E., Chief. . Office of Drinking Water and Municipal Assistance Michigan Department of Environmental Quality Constitution Hall, 4th Floor, South Tower, Pillar P8 525 W. Allegan Street Lansing Michigan 48933 ee 84-6544 xxxEND_PAGE:deq18_b226_1675_1839_024

Media Inquiry - Flint WTP Engineering

! received a call this morning (July 8) from Dominic Adams, Flint Journal/Mlive. | called him back with Mike Prysby, District Engineer sitting in on the call. Mr. Adams had obtained information that the City of Flint was contracting some engineering work for the Flint WTP, and the work was in part to potentially use the Flint River as a primary drinking water source. | informed Mr. Adams that the City of Flint receives treated water from DWSD and has been since the 1960’s, but has had the WTP available for reliability should the single transmission line system from DWSD fail. In an emergency the Flint WTP is already approved to use the Flint River for source water and is designed to meet all drinking water standards and public health requirements. : : | also informed Mr. Adams that the engineering work in question would be to primarily enhance treatment capabilities beyond minimum requirements for the purpose of softening to provide customers with water quality consistent with what they already receive from DWSD. Some equipment for softening is already in place, but under emergency operation would not normally be used due to the time required for startup and fine tuning. Mr. Adams asked whether the DEQ has approved or signed off on the proposed engineering work and on allowing the City of Flint to use the River as its source water. | explained that the ODWMA has not received a construction permit application for such work at this time, and that one would be required. | also indicated to Mr. Adams, that regardless of the source water, the City of Flint would be required to meet ail applicable Drinking Water Standards and public health requirements and again that the WTP is already approved as a redundant supply to use the Flint River as a source water _ meeting all drinking water standands and that the WTP undergoes test runs on a quarterly basis to maintain the WTP. Mr. Adams asked for more specifics regarding the treatment process and | explained that the removal of hardness for aesthetic water quality : at this WTP is called lime spiteniniy : Mr. Adams also inquired about the City being able to use the Flint River after the contract with DWSD terminates, and | indicated that may be one option, but they could also continue to purchase treated water from DWSD. In Mr. Adams voicemail he mentioned a variance to use the Flint River, and | reiterated that there is no “Variance”, but that the WTP has been constructed and approved te to treat water from the Flint River to appropriate standards as needed. Let me know if you have any questions. _Stephen Busch, P.E. Lansing and Jackson District Supervisor .- Office of Drinking Water and Municipal Assistance MDEQ 517-643-2314 xxxEND_PAGE:deq27_b325_1544_1743_011 Mr. Howard Kroft . 27 May 7, 2012 | e The fluoride concentration in Flint’s finished water must remain comparable to | the fluoride concentration in DWSD’s water. : e Suggested Practices recommends, and we fully endorse, monitoring WTP filters and plant tap for total colifom bacteria on a daily basis. In addition to plant tap monitoring, a protocol should be Sstablsied for monitoring both treated water components prior to blending. . e Finished water must meet all ‘other applicable Maximum Contaminant Levels for ° ciganle and inorganic parameters. ; . . Based upon the 2007 Water Treatment Plant Sanitary Survey and the results of the most recent WTP test runs, we are confident that the WTP can meet the operational — parameters: discussed above. Given the installation of intermediate chlorination and improved ozone residuals, Flint’s‘CT calculation will need to be “updated. Since Flint was not required to conduct the initial round of source water monitoring for cryptosporidium, treatment classification as part of the Long Term 2 Enhanced Surface Waiter Treatment Rule requirements has not been determined for the WTP. The next - round of cryptosporidium monitoring begins in 2015 and subsequent bin treatment classification for Flint will be determined by 2017 (after completing 24 months of monitoring). Additional treatment for Siypeceperslam may be required depending on. the mentary results. Also, since DWSD would no longer be Flint’s sole source of water, various water distribution system programs including Flint's Bacteriological Monitoring, Lead and Copper, and the Stage 2 Disinfectants and Disinfection Byproducts monitoring - ‘programs will change. ‘Specific changes to these monitoring programs will be discussed - in more detail after the city identifies the future operation of the Flint WTP. The-DEQ has no objection to blending Flint River water with water purchased either

Media Inquiry - Flint WTP Engineering

Date: Monday, July 08, 2013 11:20:03 AM | received a call this morning (July 8) from Dominic Adams, Flint Journal/Mlive. | called him back with Mike Prysby, District Engineer sitting in on the call. Mr. Adams had obtained information that the City of Flint was contracting some engineering work for the Flint WTP, and the work was in part to potentially use the Flint River as a primary drinking water source. | informed Mr. Adams that the City of Flint receives treated water from DWSD and has been since the 1960’s, but has had the WTP available for reliability should the single transmission line system

Rep. Muxlow/Karegnondi water pipeline

Good afternoon Bryan, Please see the response to your inquiry regarding the Karegnondi water pipeline from Stephen Busch. This was originally e-mailed to you at an incorrect address. If | can be of further assistance, please let me know. Sincerely, Leigh M. Copen Management Assistant to Madhu R. Anderson, Director, Office of Policy Maggie Datema, Director, Office of Legislative Affairs Executive Division, Department of Environmental Quality 1 xxxEND_PAGE:deq12_b149_0661_0663_1 517-241-7396

Media Inquiry

Date: Thursday, October 25, 2012 10:34:28 AM This is to inform you of communication | had with Ron Fonger, a reporter with the Flint Journal. He is working on a story regarding the Genesee County Water System’s plan to construct a new surface water intake and water treatment plant. He wanted to know how often DEQ issues surface water intake construction permits for projects similar to Genesee County’s (permits for intakes that will serve new, not existing, surface water treatment facilities). He was already aware of the intake permits issued to Genesee County and Benton Charter Township. | confirmed that these are in fact the only two intake construction permits issued by DEQ in the last five years for new intake construction intended to serve a new surface water treatment plant. | noted that a few additional intake-related permits have been issued during that time, but they were issued to existing surface water systems for purposes such as intake replacement, capacity expansion, etc. Kris Philip, Environmental Quality Specialist Office of Drinking Water and Municipal Assistance Community Drinking Water Unit 517-241-1238 xxxEND_PAGE:deq01_b224_3893_3893_1