Corrosion Control Treatment Example Study
- From
- Stephen Busch
Darren and Mike,
The City of Flint and their engineering consultant would like EPA to provide a previously approved example of an optimal
corrosion control treatment evaluation completed for a water treatment plant when full scale testing of the new source
water was not available.
This is in an effort to assist the City of Flint regarding the required corrosion control treatment evaluation of the City’s
future change in source water to Lake Huron supplied by the Karegnondi Water Authority at the City of Flint Water
Treatment Plant, as outlined in the Department’s October 30, 2015 letter to the City, and in accordance with the
November 3, 2015, EPA Memorandum Lead and Copper Rule Requirements for Optimal Corrosion Control Treatment for
Large Drinking Water Systems, both attached.
While the later part of the EPA memo discusses systems that plan to disconnect from a supplier that had installed
corrosion control treatment to determine the OCCT for the new source (and in the case of the City of Flint, new
treatment), the guidance document that is referenced in this memo appears to focus only on existing systems where
full-scale treatment evaluation is possible, with no apparent guidance for new systems or systems that disconnect from
their supplier prior to their source and treatment change.
Your assistance regarding this matter is greatly appreciated.
Stephen Busch, P.E.
MDEQ Lansing District Coordinator
Office of Drinking Water and Municipal Assistance
Lansing and Jackson District Supervisor
517-643-2314
buschs@michigan.gov
xxxEND_PAGE:deq18_b217_1652_1652_1