Corrosion Control
- From
- Howard Croft
- To
- Samir Matta , Warren Green
Samir,
We are looking to fast track the corrosion control to basically a 24/7 effort. 1 believe that the Director of the MDEQ will be support
fast as possible
I will work internally to complete all contractual needs under an emergency basis and will look to talk with you very soon to confin
that may be required from the City.
Thank you,