Good morning, Maxine:
Attached is a copy of the approval letter for resolution #EMA1572015, authorizing the City to enter into
change order #4 with Lockwood, Andrews and Newman to address TTHM levels.
The signed original will be mailed to you via US Postal Service.
Thank you,
Robert Widigan | Office of Fiscal Responsibility
State of Michigan | Department of Treasury
430 W. Allegan Street | Lansing, MI 48922
Office (517) 335-2130 | Cell (517) 243-8645
WidiganR @michigan.gov
xxxEND_PAGE:treasury01_b24_3567_3629_29
RICK SNYDER STATE OF MICHIGAN
72 (Rev. 11-13) GOVERNOR DEPARTMENT OF TREASURY R. KEVIN CLINTON
LANSING STATE TREASURER
April 13, 2015
Gerald Ambrose, Emergency Manager
City of Flint
1101 South Saginaw Street
Flint, MI 48502
Mr. Ambrose:
Iam in receipt of your request dated April 9, 2015 in which you are requesting approval to amend
the existing contract with Lockwood, Andrews and Newnam, for additional design, procurement,
and construction services, not to exceed $1,601,740, for a total revised contract price of
$2,980,440.00.
Pursuant to P.A. 436 of 2012, any no-bid contract with a value exceeding $50,000 must receive
approval from the State Treasurer. I am approving this request based on the City’s need for new
Granulated Activated Carbon (GAC) Filters to assist reducing the levels of TTHM.
State Treasurer Approval:
I, R. Kevin Clinton, State Treasurer for the State of Michigan, pursuant to the authority assigned
by Public Act 436 of 2012, do hereby:
a Approve Submitted Recommendation
Deny Submitted Recommendation
Sincerely,
——> >
RY Gn lialis-
R. Kevin Clinton, State Treasurer Date
Michigan Department of Treasury
430 WEST ALLEGAN STREET « LANSING, MICHIGAN 48922
© (517) 373-3200
xxxEND_PAGE:treasury01_b24_3567_3629_30
EM supMissionno: CMA 15 720/ S
prisenrep:—“f- 9- JS
ADOPTED:
RESOLUTION AUTHORIZING APPROPIRATE CITY OFFICIALS TO ENTER INTO
CHANGE ORDER #4 WITH LOCKWOOD, ANDREWS, & NEWNAM
BY THE EMERGENCY MANAGER:
The City of Flint Department of Public Works & Utilities (DPW & Utilities) entered into a contract
with Lockwood, Andrews, and Newnam to study the feasibility and develop cost estimates for the
Water Plant as a primary drinking water source in a contract amount not to exceed $1,378,700.00;
and
The DPW & Utilities through recommendations of Veolia North America water consultants have
identified additional services due to TTHM concerns. The additional services will provide a turn
key system of new GAC media in the twelve (12) filters at the Flint Water Plant including MDEQ
permitting. The focus will be to provide design, procurement, and construction implementation
services for upgrading the filters to address TTHM. The additional cost for these services is not
to exceed $1,601,740.00. Funding for said services will come from the following account: 591-
545,300-801.000; and
IT IS RESOLVED, that the appropriate City of Flint officials, upon the Emergency Manager's
approval, is authorized to enter into change order #4 with Lockwood, Andrews and Newnam, for
additional design, procurement, and construction services, not to exceed $1,601,740.00, for a total
revised contract price of $2,980,440.00.
APPROVED AS TO pe IRM: APPROVED AS TO FINANCE:
Dawn Steele, Deputy Finance Director
Lf tasha Le a bps City Administrator
DISPOSITION:
ENACT REFER TO COUNCIL FAIL
DATED:
Gerald Ambrose, Emergency Manager
xxxEND_PAGE:treasury01_b24_3567_3629_31
RESOLUTION STAFF REVIEW
DATE: April 8, 2015
Agenda Item Title: Resolution Authorizing Appropriate City Officials to Enter Into
Change Order #4 with Lockwood, Andrews, & Newnam
Prepared By: Yolanda Gray, Utilities Accounting Coordinator
Background/Summary of Proposed Action
The City of Flint Department of Public Works & Utilities (DPW & Utilities) entered into a
contract with Lockwood, Newnam, to study the feasibility and develop cost estimates for
utilizing the Water Plant as a primary drinking water source in a contract amount not to
exceed $1,378,700.00.
The DPW & Utilities through recommendations of Veolia North America water
consultants is requesting additional services due to TTHM concerns. The additional!
services will provide a turn key system of new GAC media in the twelve (12) filters at
the Flint Water Plant including MDEQ permitting. The focus will be to provide design,
procurement, and construction implementation services for upgrading the filters to
address TTHM concerns. The additional cost for these services is not to exceed
$1,601 ,740.00, for a total contract price of $2,980,440.00.
Financial Implications: Funding will be made available in professional services
account 591-536.100-801.000.
Account: 591-536.100-801.000
Pre-encumbered: Yes No_x_ Requisition:
Other Implications (1.e., collective bargaining):
Staff Recommendation: Recommend Approval
xxxEND_PAGE:treasury01_b24_3567_3629_32
lan se8e
A LEO A DALY COMPANY
Client Additional Services Authorization Date: 4-7-15
Project Name Flint WIP Phase II Segment I Initial Watermain Cut-in | Additional Services Authorization No.
Flint WTP Phase II Segment I Rehab
Flint WTP Ph II-Seg II - Lime Residual Disposal
(alahecaliainis
Subject of Additional Services Original Contract Date
Description
Deliver a new GAC media to replace current anthracite media in the 12 filters at the Flint Water Treatment Plant (FWI?P)
through design-construction management at agency services. The purpose of the project will to be replace the existing filter
system with a new GAC media in order to assist the city in addressing TTHM concerns as detailed in the "Flint, Michigan
Water Quality Report" dated March 12, 2015 by Veolia North America (Veoila Report). The services shall include:
1- Design the GAC Filter replacement for the FWTP, which will include assisting the City in obtaining the necessary MDEQ
Permit(s) and providing construction oversight; ($147,840.00)
2- Provide construction management at agency services for the removal of the existing media and the installation of the GAC
filter at the FWTP. On behalf of the City, as City's CM Agent, engage a vendor that will procure new GAC Media, remove
existing 18” anthracite and replace it with the new 18° GAC; (approximately $1,300,000.00)
3- Set up, upgrade and calibrate the Flint Distribution Water System to include field Tesing Verification and Support in order to
analyze system perfomance and water age mapping and assist the City with line flushing/and or Ice Pigging Program;
($99,900.00)
4- Project Engineering Services to assist the City with monitoring and coordinating activities with city staff, MDEQ and
vendors during the maintenance and implementation of improvements needed thrn the August TTHM Sampling period. Services
will be provided based on 60 hours/month for a total of five (5) months period; ($54,000)
Reason for Change
1) Pursuant to the Veolia Report replacing the anthracite in the filters with new GAC Media will assist in lowering the levels of
TTHM. The replacement of the existing filter requires the performance of CT Analyses, conducting an evaluation of Hydraulic
Loading and Backwash Capacities of the new GAC cross section, and meeting and coordinating with MDEQ to obtain MDEQ's
approval of changes to the current permit;
2) In addition to the design, the replacement requires managing, on behalf of the City, the construction services of a vendor to
implement design improvements of the filter system upgrade to the GAC media.
3) Modificaions to the hydraulic model are needed to upgrade the model and calibrate actual system performance and
operation to include valve operational performance based on Service Center Report.
4) Provide a project engineer to work with the City, MDEQ and the vendors will assist in implementing Veolia's
recommendations to the extent accepted by the City. Such engineering services will provide weekly progress reports to the City
allowing the City to monitor the progress of the Project.
Compensation:
LI wWilbean amount equalto__ times Salary Cost plus relmbursable expenses, both defined in the
PROFESSIONAL SERVICES AGREEMENT, anc In addition to the compensation for BASIC
SERVICES. Total charges for these ADDITIONAL SERVICES are estimated to be approximately
t_..
C1 witlee the ump sum of $ for hess ADDITIONAL SERVICES.
Other __Cost plus based on current rates for a Not-To Exceed amount of $1,601.740.00 (uss ravaree if
necessary)
xxxEND_PAGE:treasury01_b24_3567_3629_33
Completion: Current Date 6-15-14
This Extension 3 months
New Date
Proposed By: Lockwood, Andrews & Newnam, Inc.
Warren Green, PE
Print Name/Titte
City of Flint
— Client
Print Name/TRle
Execute In duplicate ~ (1) copy to Client, (1) copy ta Accounting
xxxEND_PAGE:treasury01_b24_3567_3629_34
Flint Water Interagency Coordinating Committee Subcommittees
Incident Action Plan Subcommittee
Chair - Capt. Chris Kelenske
Harvey Hollins
Water Quality Subcommittee
Chair — Keith Creagh
Nick Lyon
Dr. Laura Sullivan
Dr. Marc Edwards
Dr. Yanna Lambrinidou
Mark Valacak
EPA
Suggested Tasks
¥ Response tactics and flow process
Y Testing
= Lead and Copper
» Other Contaminants and Disease Transmission
Y Monitoring and reporting entry of contagions
Water Infrastructure integrity Subcommittee
Chair — Keith Creagh
Jim Koski
Dr. Laura Sullivan
Dr. Marc Edwards
Jamie Curtis
Natasha Henderson
American Water Works Association
EPA
Suggested Tasks
Y¥ Reliability Study
Y Infrastructure upgrade/replacement
¥ Lead Line Replacement
KWA Subcommittee
Chair — Khouri
Keith Creagh
Harvey Hollins
Natasha Henderson
Jamie Curtis
Larry Steckelberg
EPA
Suggested Tasks
Benefit-Cost Analysis
Transition
Safety
Flint Water Treatment Plant Upgrade
Rate Structure
SANKN
Updated 2/8/16
xxxEND_PAGE:treasury01_b24_3567_3629_35
Health and Education Subcommittee
Chair - Nick Lyon
Mayor Karen Weaver
Dr. Mona Hanna-Attisha
Dr. Lawrence Reynolds
Superintendent Brian Whiston
Deputy Superintendent Kyle Guerrant
Sue Moran
Dr. Eden Welis
Dr. Jane Turner
Stan Bien (WIC)
Dawn Sweeney (SNAP)
Suggested Tasks
Health and Safety Plan
Responder Medical Plan
Nutrition
Post Exposure Actions
Pre-K and Secondary education materials
KARAS
Policy Subcommittee
Chair — Mike Zimmer
Nick Khouri
Larry Steckelberg
Dr. Marc Edwards
Keith Creagh
Nick Lyon
Dr. Lawrence Reynolds
Mark Valacak
Suggested Tasks
¥ \ntra-agency Protocols
v Statewide Policy
v¥ Lead and Copper Rule Change Recommendations
Communication Protocois and Transparency Subcommittee
Chair — Hollins
Nick Lyon
Meegan Holland
Melanie Brown
Suggested Tasks
~ Public education and awareness
Updated 2/8/16
xxxEND_PAGE:treasury01_b24_3567_3629_36