Manager Meeting Bullets
- From
- Amy Lachance
- To
- Heather Bishop , Wood Chooi , Luke Dehtiar , Nancy Einhardt , Esparsa
A couple things from my meeting on Monday:
-EPA has proposed the next round draft targets (metrics) for things like percentage of systems in
compliance with drinking water standards, percentage of surveys completed within three years,
etc. These are the same metrics we have had before, with some slight adjustments to the target
numbers. Reports will be run soon to check our compliance with these targets. One target that we
are close on is the percentage of systems with source water protection — keep cranking out those
source water assessments as you are completing surveys, please! Also, engineers please run your
permit database report and check your average days to issuance numbers — there are some outliers
in there that maybe just need to be cleaned up. And some empty entries that may need to be
deleted.
-Field Operations Section needs to produce a ~40 minute presentation for the In-Service day in
August. Any ideas? We are going to try to keep it light and interesting, as well as informative. It
xxxEND_PAGE:deq04_b485_4845_4847_1
should portray all state-wide functionality, but still be fun. Kind of like “News from the Field” but
not just about engineering projects. Anyone want to work on this with me?
-The Classification of Public Water Supplies Policy is being revised to fine-tune the definition of
seasonal systems in anticipation of the RTCR. It may also contain some clarifications. A draft will be
sent out to all for review.
-RRD has some training sessions coming up in October that will include their new approach to
institutional controls involving county ordinances. Liane is going to try to make sure that the local
health departments are aware of these changes ahead of time.
-Lansing will be drafting a letter to all MHC’s regarding their upcoming requirements for cross
connection programs. Drafts will be due to us in October/November so that the plans can be
approved and in place by 1/1/16. They will include a box where we can just sign, date and approve,
then send back the original to them rather than writing an approval letter. These letters will likely
be prepared centrally with Debbie’s signature, although we will see the draft.
-Along those lines, we may ask for stamps that say “Reviewed and Approved By: & Date: “so that
we can do more of that with submittals instead of approval letters. This saves confusion later when
the approval letter gets separated from the original plan in the file and you aren’t sure which
version was approved. Do we have one of these already in either office? (If | bold it, you might
read this part!)
-Debbie is also working on a merge letter to send to all MHC’s, detailing their compliance status.
DLARA has required all MHC’s to submit these letters to them prior to their mass relicensing this
fall. These letters will pull from the last survey done at the MHC but we will have an opportunity to
override the form letter if we have a health-related reason to hold up their license. We may also
have the option of modifying the letter to state that if they don’t come into compliance with a more
minor item, we will recommend against relicensing the next cycle. The drafts will be coming to us
around the end of July and going out to the MHC’s by the end of August, so tell folks to sit tight if
you get questions about it.
-We didn’t get to the agenda item on engineering plans and HP Trim, but | will be following up on
this.
-AWWA and ODWMA just finalized their mutual aid agreement for this year, and solicitations for the
annual section meeting in Sault St. Marie (9/16-18/15) will be out soon. There are 20 slots available.
-We had an overview on Labor Relations from Dale Lehman.
-Kate (Lundquist) Jannereth was announced to be going to another division but now she is staying
although her duties may change.
-There is an on-going internal audit taking place in Lansing. It is possible that they may want to look
at some district files.
xxxEND_PAGE:deq04_b485_4845_4847_2
- Steve B. gave an overview of what is taking place in Flint regarding lead sampling.
Let me know if you have questions or want to follow up on any of this. Thanks — Amy
xxxEND_PAGE:deq04_b485_4845_4847_3