Flint 30 & 24-inch WM

Mike, In response to your concerns of fewer connections between the 24-inch transmission main in the Iroquois corridor we offer the following explanation. It is our understanding the purpose of this transmission main is to convey water to the southwest portion of Flint. In the Iroquois corridor alone there are 18 connections (1 about every 300 feet) feeding off the transmission main. With the aid of our water system hydraulic modeling software, we were able to reliably eliminate 4 connections. Based the modeling data, there would be little or no loss of capacity in the Iroquois corridor with the elimination of these 4 connections. There are 12-inch mains located a couple blocks east and west of Iroquois corridor, one along Chevrolet Ave to the other along Martin L. King Avenue that are able to fulfill the demands in the area even without these four connections. If you have any other questions or concerns my contact information is provided below. Thanks, Dean A, Oparka, P.E. Senior Project Engineer Rowe Professional Services Company Mail: P.O. Box 3748 Location; 540 S, Saginaw Street Flint, MI 48502 Office Phone: (810)-341-7500 Cell phone: (810)-701-8217 xxxEND_PAGE:deq01_b033_1845_3570_0306 ; 002151 oe 3 {© : ncgbcarnicn OF NATURAL RESOURCES AND eADonwenr PERMIT APPLICATION FOR WATER SUPPLY sYsTems/{} ENTERBD EREIN_? (CONSTRUCTION - ALTERATION - ADDITION OR IMPROVEMENT) AS DESCRIBED H ‘ae Required under the Authority of 1976 PA 399, as amended This application becomes an Act 399 Permit only when signed and issued by authorized Michigan Department of Natural Resources and Environment (DNRE) Staff. See instructions below for completion of this application. 1. Municipality or Organization, Address and WSSN Permit Stamp Area (DNRE use only) that will own or control the water facilities to be constructed. This permit is to be issued to: City of Flint Water Service Center 3310 E. Court Street Flint, MI 48506 WSSN: 2310 2. Owner’s Contact Person (provide name for questions): MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY w 131020MR18203 °% PERMIT NO, Contact: Rob Bincsik Title: | Supervisor of Water Distribution & Sewer Phone: (810)-766-7202 3. Project Name (Provide phase number if project is segmented): EXAMINED AND APPROVED FOR CE MPEIANGE WITH ACT 399, P.A. 1976 Rad 4. Project Location 5. County (location of project): (City, Village, Township): Genesee City of Flint 24-inch Water Main Replacement _| ISSUED UNDER THE AUTHORITY OF THE DIRECTOR OF THE DEPARTMENT OF NATURAL ‘OL AND ENVIRONMENT ce: VA ACE Atco ENT psi Issued by: WA,.O pEsou! ocl 10 av? Reviewed by: (J If this box is marked coger Becta conditions. Instructions: Complete items 1 through 5 above and 6 through 21 on the following pages of this application. Print or type all information except for signatures. Mail completed application, plans and specifications, and any attachments to the | DNRE District Office having jurisdiction in the area of the proposed construction. Please Note: a. This PERMIT only authorizes the construction, alteration, addition or improvement of the water system described herein and is issued solely under the authority of 1976 PA 399, as amended. b. The issuance of this PERMIT does not authorize violation of any federal, state or local laws or regulations, nor does it obviate the necessity of obtaining such permits, including any other DNRE permits, or approvals from other units of government as may be required by law. c. This PERMIT expires two (2) years after the date of issuance in accordance with R 325.11306, 1976 PA 399, administrative rules, unless construction has been initiated prior to expiration. d. Noncompliance with the conditions of this permit and the requirements of the Act constitutes a violation of the Act. e. Applicant must give notice to public utilities in accordance with 1974 PA 53, (MISS DIG), being Section 460.701 to 460.718 of the Michigan Compiled Laws, and comply with each of the requirements of that Act. f. All earth changing activities must be conducted in accordance with the requirements of the Soil Erosion and Sedimentation Control Act, Part 91, 1994 PA 451, as amended. g. All construction activity impacting wetlands must be conducted in accordance with the Wetland Protection Act, Part 303, 1994 PA 451, as amended. h. Intentionally providing false information in this application constitutes fraud which is punishable by fine and/or imprisonment. i. Where applicable for water withdrawals, the issuance of this permit indicates compliance with the requirements of Part 327 of Act 451, Great Lakes Preservation Act. EQP5877 (Rev. 1/2010) A xxxEND_PAGE:deq01_b033_1845_3570_0307 002152 MICHIGAN DEPARTMENT OF NATURAL RESOURCES AND . Permit Application for Water Systems (Continued) 6. Facilities Description — In the space below provide a detailed description of the proposed project. Applications without adequate facilities descriptions will be returned. SEE EXAMPLES BELOW. Use additional sheets if needed. 5800 feet of 30-inch water main beginning at the Flint Water Treatment Plant and commencing northwest to the intersection of Dort Highway and |-475. Continuing westerly under I-475 west to James P. Cole Boulevard. From there the main continues west across City of Flint dedicated utility right-of-way to Form General Motors Buick City property. The pipe crosses within dedicated utility right-of-way at the northern end of former GM property to the Intersection of Wager Avenue and Horton Avenue. The main changes to 24-inch pipe at this point and the route is described bellow. 23,550 Feet of 24" water main continuing west from intersection of Wager and Horton. West, 11 blocks along Wager Avenue from Horton Ave. to N. Saginaw St. South, 1 block, along N. Saginaw Street from Wager Ave. to E. Bishop Ave. West, 6 blocks, along E. Bishop Avenue from N. Saginaw St. to DuPont St. South, 7 blocks, along DuPont Street from Bishop Ave. to Pasadena Ave. East, 1 block, along Pasadena Avenue from DuPont St. to Iroquois Ave. South, 20 blocks, along Iroquois Avenue from Pasadena Ave. to Stockdale St. East, Jog of Approx. 100 feet, along Stockdale Street from Iroquois Ave. to Euclid Ave. South, 1 block, along Euclid Avenue from Stockdale St. to Welch Blvd. West, 1 block, along Welch Boulevard from Euclid Ave. to Seminole St. South Southwest, 3 blocks, along Seminole Street from Welch Blvd. to DuPont St. South, 10 blocks, along Dupont Street from Seminole St. to Chevrolet Ave. Water main changes to 16-inch at this intersection. 1068 feet of 16-inch water main continuing south along Dupont Street 3 blocks to University Avenue Replace 5300 feet of 8-inch water main Along W. Bishop Avenue from DuPont Street to Saginaw Street Place 1500 feet of new 8-inch water main Along DuPont Street from Pasadena to Myrtle EXAMPLES — EXAMPLES — EXAMPLES — EXAMPLES — EXAMPLES — EXAMPLES Water Mains 500 feet of 8-inch water main in First Street from Main Street north to State Street. | OR 250 feet of 12-inch water main in Clark Road from an existing 8-inch main in Third Avenue north to a hydrant. Booster A booster station located at the southwest corner of Third Avenue and Main Street, and equipped with Stations two, 15 Hp pumps each rated 150 gpm @ 200 feet TDH. Station includes backup power and all other equipment as required for proper operation. Elevated A 300,000 gallon elevated storage tank located in City Park. The proposed tank shall be spherical, all Storage Tank | welded construction and supported on a single pedestal. The tank shall be 150 feet in height, 40 feet in diameter with a normal operating range of 130 — 145 feet. The interior coating system shall be ANSI/NSF Standard 61 approved or equivalent. The tank will be equipped with a cathodic protection system, and includes a tank level control system with telemetry. Chemical A positive displacement chemical feed pump, rated at 24 gpd @ 110 psi to apply a chlorine solution for Feed Well No. 1. Chlorine is 12.5% NaOCL, ANSI/NSF Standard 60 approved and will be applied at a rate of 1.0 mg/l of actual chlorine. Water Supply | Well No. 3, a 200 foot deep well with 170 feet of 8-inch casing and 30 feet of 8-inch, 10 slot screen. The Well well will be equipped with a 20 Hp submersible pump and motor rated 200 gpm @ 225 feet TDH, set at 160 feet below land surface. Treatment A 5 million gpd water treatment plant located at the north end of Second Avenue. The facility will Facilities include 6 low service pumps, 2 rapid mix basins, 4 basins, 8 dual media filters, 3 million gallon water storage reservoir and 6 high service pumps. Also included are chemical feed pumps and related appurtenances for the addition of alum, fluoride, phosphate and chlorine. EQP5877 (Rev. 1/2010) ess xxxEND_PAGE:deq01_b033_1845_3570_0308 002153 MICHIGAN DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENT Permit Application for Water Systems (Continued) General Project Information — Complete all boxes below. 7. Design engineer's name, engineering firm, address, 8, Indicate who will provide project construction inspection: phone number, and email address: Clorganization listed in Box 1. Engineering firm listed in Box 7. Jeffrey B. Markstrom, P.E. (_JOther - name, address, and phone number listed below. Rowe Professional Services Company P.O. Box 3748 Flint, MI 48502 (810)341-7500 [email protected] 9. Is a basis of design attached? Olyves EAN | If no, briefly explain why a basis of design is not needed. Replacement of Existing Main 10. Are sealed and signed engineering plans attached? KIYES LINO If no, briefly explain why engineering plans are not needed. | 11. Are sealed and signed construction specifications attached? KlYEs CINO If. specifications are not attached, they need to be on file at DNRE. 12. Were Recommended Standards for Water Works, Suggested Practice for Water Works, AWWA guidelines, and the requirements of Act 399 and its administrative rules followed? KIYES (No If no, explain which deviations were made and why. 13. Are all coatings, chemical additives and construction materials ANSI/NSF or other adequate 3” party approved? NO lyes If no, describe what coatings, additives or materials did not meet the applicable standard and why. 14. Are all water system facilities being installed in the public right-of-way or a dedicated utility easement? (For projects not located in the public right-of-way, utility easements must be shown on the plans.) KIYES N If no, explain how access will be obtained. = 15. Is the project construction activity within a wetland (as defined by Section 324.30301(d)) of Part 303, 1994 PA 451? Oyves INO If yes, a wetland permit must be obtained. - 16. Is the project construction activity within a 100-year floodplain (as defined by R 323.1311(e)) of Part 31, 1994 PA 451, administrative rules? Oyes KINO If yes, a flood plain permit must be obtained. e 17. Is the project construction activity within 500 feet of a lake, reservoir, or stream? Ives If yes, a Soil and Erosion Control Permit must be obtained or indicate if the owner listed in box 2 of this application is an Authorized Public Agency (Section 10 of Part 91, 1994 PA 451) [] Owner is APA. EQP5877 (Rev. 1/2010) xxxEND_PAGE:deq01_b033_1845_3570_0309 | 002154 : wc DEPARTMENT OF NATURAL RESOURCES AND D crvenr Permit Application for Water Systems (Continued) 18. Will the proposed construction activity be part of a project involving the disturbance of five (5) or more acres of land? CyYes JNO If yes, is this activity regulated by the National Pollutant Discharge Elimination System storm water regulations? ‘ LIYES: NPDES Authorization to discharge storm water from construction activities must be obtained. (INO: Describe why activity is not regulated: Please call 517-241-8993 with questions regarding the applicability of the storm water regulations. 19. Is the project in or adjacent to a site of suspected or known soil or groundwater contamination? LYEs JNO If yes, attach a copy of a plan acceptable to the DNRE for handling contaminated soils and/or groundwater disturbed during construction. Contact the local DNRE district office for listings of Michigan sites of environmental contamination. 20. IF YOU ARE A CUSTOMER/WHOLESALE/BULK PURCHASER, COMPLETE THE FOLLOWING 1) Name and WSSN of source water supply system (seller) City of Detroit 2) Does the water service contract require water producer/seller to review and approve customer/wholesale/bulk purchaser water system construction plans? OYes INO If yes to #2, the producer/seller approval letter must be attached when submitted to DNRE. 21, Owner's Certification The owner of the proposed facilities or the owner's authorized representative shall complete the owner's certification. It is anticipated that the owner will either bea governmental agency (city, village, township, county, etc.) or a private owner (individual, company, association, etc.) of a Type | public water supply. OWNER’S CERTIFICATION 2 rae ; ~ E I, Kob in a Bi nese (name), acting as the Supenvige Si hdde _(title/position) for (print) (print) Ct © of Flt (entity owning proposed facilities) certify that this project has print; been reviewed and approved as detailed by the Plans and Specifications submitted under this application, and is in compliance with the requirements of 1976 PA 399, as amended, and its administrative rules. inwe eae Sele BiO -S77-B267 Signature* Date Phone *Original signature only, no photocopies will be accepted. EQP5877 (Rev. 1/2010) xxxEND_PAGE:deq01_b033_1845_3570_0310 002155 - ning te ® CITY OF FLINT SPECIAL PROVISION FOR ALTERATION OF MUNICIPAL WATER SYSTEM ROWE: COF 1 OF 21 Description FORE RBIO This special provision replaces section 823 of the 2012 Michigan Department of Transportation Standard Specifications for Construction. This work shall consist of installing ductile iron watermain of the nominal diameter shown on the plans. This work includes the furnishing of all labor, equipment, and materials including shop drawings, required for excavation, installation, and backfilling as shown on the plans and specified herein. A. Grades All mains are to be laid with a minimum cover of five and 1/2 (5.5) feet unless otherwise shown on plans. This cover is to be from finish grade of the street. All mains are to be laid with a minimum cover of (6) feet under railroad track. B. Miscellaneous Services from the City/Contractor The Contractor shall notify the Engineer in writing, with copy of notification to City of Flint Water Service Center Supervisor, a minimum of four full working days prior to work requiring involvement of City of Flint Water Service Center personnel. The contractor shall coordinate all activity related to water main construction with the City of Flint Water Service Center personnel. Costs and time for such coordination and services shall be considered included in the progress schedule and Miscellaneous Watermain Coordination Allowance pay item. The City will chlorinate or otherwise disinfect the water mains at the expense of the Contractor, payment to be reimbursed through the Miscellaneous Watermain Coordination Allowance pay item. The City will furnish water for filling the mains for testing purposes. Water will be made available at connections of new mains to existing mains, or at existing fire hydrants. All connections shall be made in a manner and under conditions meeting the approval of the Water Distribution Supervisor. No charge will be made of the Contractor by the City for the use of water for testing purposes. All necessary attachments, devices and pumping for the proper use of such water are to be furnished by the Contractor at his expense, and shall be subject to the approval of the Water Distribution Supervisor. : The Contractor will furnish all tapping valves with sleeves, corporations for chlorination, pressure testing and water services. Contractor will perform all excavation, backfill, compaction, preparation and restoration of the site. The City of Flint will install all pressure taps, taps for chlorination, pressure testing and water services. Contractor shall coordinate the installation provided by the City with City personnel. Contractor shall notify City personnel one week in advance of service and update status as requested. The City of Flint will make all connections and pressure taps to the existing water main. Contractor will perform all excavation, backfill, compaction, preparation and restoration of the site. The Contractor will supply all parts arid valves as noted on the plans. DEQ RESOURCE MANAGEMENT DIVISION OCT 1.9 2012 LANSING DISTRICT xxxEND_PAGE:deq01_b033_1845_3570_0311 002156 ROWE: COF 2 OF 21 SEPTEMBER 2012 The Contractor will remove, salvage and deliver all existing hydrants to the City of Flint (location to be determined at the preconstruction meeting). The City will provide for watermain inspection, and any material testing, at the expense of the Contractor, payment shall be reimbursed with the Contractor Cost for Watermain Inspection pay item. City personnel will perform installation of all service connections from corporation including curb stop and box. Installation of corporations and connections to the existing services (materials provided by Contractor) will be by City of Flint personnel. This work will include all labor by City of Flint personnel to install corporations to the existing and proposed watermain and connect existing service leads. Contractor will perform all excavation, backfill, compaction, preparation and restoration of the site. Cc. Storing Materials and Supplies Materials and supplies, if necessary, may be placed adjacent to the improvement, but ample way for foot traffic must at all times be maintained free from obstruction except with the express permission of the Water Distribution Supervisor. Any damage to the walks or property by reason of such storing of matenals must be repaired by the Contractor at his own expense. The Contractor must not (except after consent from the proper parties) enter or occupy with men, tools, or materials any land not the property of the City, or land on which an easement or right has not been secured by the City. D. Convenience to Public During the progress of the work, the convenience of the public and of residents along the street must be provided for as far as practicable. Convenient access to driveways, houses and buildings along the street must be maintained wherever possible. The sidewalk or crosswalk shall be replaced, after backfilling of the water main, as noted on the plans. All traffic control and detouring of the streets will be done according to the plans and as specified in the Special Provision for Maintaining Traffic. E. Structures Above Ground Existing structures above ground such as utility poles, street lighting standards, parking meter supports, hydrants and the like and buildings shall be protected from damage. The Contractor shall be responsible for damage to any structures or fixtures above ground caused by his operations. The Contractor shall also be responsible for damage to existing underground structures caused by his operations as previously specified herein. PF: Fire Hydrants No material or other obstruction shall be placed within ten feet of existing fire hydrants. Hydrants shall at all times be readily accessible to the Fire Department. G. Rights-of-Way In general, work under contract that is located in City streets or on City property. Rights-of- way across private property, where required, will be secured by the City without expenses to xxxEND_PAGE:deq01_b033_1845_3570_0312 002157 ROWE: COF 3 OF 21 SEPTEMBER 2012 the Contractor. The Contractor shall hold himself strictly within the rights secured to him by the City in prosecuting the work on private property. H. Use of Mains before Final Completion The City shall have the right to make use of such portions of completed acceptably tested mains, during the construction period as they may find practicable. Such use by the City shall not relieve the Contractor from responsibility for any leaks or defective work in such mains and accessories which may develop prior to the final acceptance of all work under this contract. I. Trees, Shrubs, Etc. Trees, shrubs, etc., in the line of the water main, will be removed, as noted on the plans. Materials A. Concrete Class A - (for all structures) 4: 2: 6: Mix (Minimum cement per cubic yard of concrete - 1.55 Ibs) Class B - (Lean concrete for fill) 1: 3: 3: Mix (Minimum cement per cubic yard of concrete - 1.10 Ibs) All "Class A” concrete shall show a minimum 28 day strength of 3,500 pounds per square inch, and "Class B” concrete, 1,000 pounds, per square inch. The retempering of concrete which has partly hardened, that is, remixing with or without additional cement, aggregate or water, will not be permitted. Transit mixed concrete may be used. In order to obtain clean and firm bearing surfaces, all water and softened material shall be removed from excavations immediately before concrete is deposited. Concrete shall not be deposited in water nor shall water be allowed to rise over the concrete until ithas hardened ° sufficiently to prevent injury thereto. Any flow of water into the excavation shall be diverted through proper side drains to a pump, or by lowering the ground water level by means of pumps or removed by other approved means, which will avoid washing the freshly deposited concrete. Concrete shall be deposited in accordance with approved practice and in a manner and under conditions which will meet the approval of the Engineer. The surface of concrete and mortar that will be exposed to the sun or to premature drying after placing shall be kept constantly moist by sprinkling at frequent intervals, or by covering with moist burlap or canvas or by other means equally effective, for a period of seven (7) days after completion. Freshly finished surfaces shall be protected by supported canvas or xxxEND_PAGE:deq01_b033_1845_3570_0313 002158 ROWE: COF 4 OF 21 SEPTEMBER 2012 other protection during rain or storms. A sufficient quantity of canvas or other protection shall be kept ready for this purpose. B. Reinforcing Steel Reinforcement steel shall conform to standard specifications for billet bars for concrete reinforcement, intermediate grade, serial designation A15-39 of American Society for Testing Materials. C. Water Valve Manholes Gatewells (gate valve in manhole) and well structures (check valve in manhole) materials shall be in accordance with Section 403 of the 2012 MDOT Standard Specifications for Construction or in accordance with the Standard Details. All valve manhole frames and - covers shall be as specified on the Drawings. An exterior seal of Wrapid Seal or a City of Flint approved alternate shall be installed to seal all valve manholes. Outside of road right-of-ways, Contractor shall use a City of Flint or Engineer approved one and one-quarter inch (114") pre-formed butyl rubber sealant between grade rings, valve manhole frames and valve manhole sections. Within road right-of-ways, Contractor shall use mortar between grade rings, valve manhole frames and valve manhole sections. All tapping valves shall be installed in valve manholes. All valves, 12 inches and larger, installed in paved areas shall be installed in valve manholes to manhole frames. All structures shall be at grade when installed under Bavne areas or at six inches (6”) below grade when installed under gravel roads. The top of the valve manhole frames and covers shall be installed flush with finished pavement grade, finished lawn grade or six inches (6”) below road grade in gravel roads. Openings for watermain pipe inlets or outlets shall be provided in pre-cast units at the locations required and shall be true to form and approximately one inch (1") larger in diameter than the outside of the watermain pipe to provide for a mortar seal. The openings around all watermain pipe shall be completely sealed using non-shrink cement mortar grout. Water valve manholes shall be constructed of pre-cast concrete and shall conform to ASTM ‘C478-03 and contain'a modified joint and premium rubber gasket which shall conform to ASTM C443-02. Valve manhole sections shall be installed on eight inch (8”) thick pre-cast base slabs or installed integrally with the slab section. The valve manhole size shall be determined in accordance with the table provided on the watermain detail sheet. D. Manhole Steps All manhole steps shall be copolymer polypropylene plastic and installed in valve manholes at a spacing of sixteen inches (16") on center. All Copolymer polypropylene steps shall be M.A. Industries PS-1-PF, American Step Co. ML-10 with one-half inch (14”) grade 60 steel reinforcement or a City of Flint approved alternate. xxxEND_PAGE:deq01_b033_1845_3570_0314 002159 ROWE: COF 5 OF 21 SEPTEMBER 2012 E. Pipe Pipe used in the water distribution system shall be ductile iron pipe centrifugally cast in metal or sand-lined molds conforming to ANSIVAWWA C150/A21.50 and ANSI/AWWA C151/A21.51 as amended to date. Push-on joints, mechanical joints, and/or restrained joints shall conform to ANSI/AWWA C104/A21.4 as amended to date. DIAMETER DESIGNATION THICKNESS 4-inch Class 54 35-inch 6-inch Class 54 -37-inch 8-inch Class 54 -39-inch 10-inch Class 54 41-inch 12-inch Class 54 43-inch 16-inch Class 54 46-inch 18-inch Class 54 47-inch 20-inch Class 54 -48-inch 24-inch Class 54 -50-inch The metal thickness class, net weight of the pipe without lining, the nominal size, and the manufacturers identifying symbol! shall be clearly marked on each length of pipe. Types of pipe and pipe sizes larger than 12-inch shall be specified individually based upon the particular conditions of the specific project. The pipe shall have cement-mortar lining conforming to ANSI/AWWA C104/A21.4 as amended to date. The pipe shall have a push on joint with a single rubber gasket and shall include brass or bronze wedges to permit electrical thawing. Polywrap meeting ANSI/AWWA C105/A21.5-99 for 8 mil Linear Low Density polyethylene encasement is required to cover all underground watermain and appurtenances including service taps and excluding copper service lead tubing. i AWWA Body RESILIENT - SEATED GATE VALVES A. Scope This specification covers iron-body resilient-seated gate valves with non-rising stems (NRS) from 3" to 12" nominal pipe size. B. Specific Requirements is Standard xxxEND_PAGE:deq01_b033_1845_3570_0315 002160 ROWE: COF 6 OF 21 SEPTEMBER 2012 The valves covered by this specification shall be in conformance with requirements of the current AWWA Specification C515, Underwriters Laboratories Standards UL262 and Factory Mutual Standard 1130. The Ductile Iron Body, Bonnet, Seal Plate, and Wedge are manufactured from Iron conforming to ASTM A536. The epoxy coating shall be in accordance with ANSI/AWWA C550 and certified to NSF61. The wedge is fully rubber encapsulated to meet ASTM D429 requirements. The following specifications also apply. General Gate valves are to be FlowMaster® Resilient Wedge Gate Vales as manufactured by East Jordan Iron Works. All valves shall be mechanical joint type with non-rising stems and O ring seal. Valves are to be placed in the vertical position and open to the right (clockwise). The valve interior shall be coated with an epoxy. The manufacturer shall supply catalog data including illustrations and part schedules. The manufacturer shall furnish the purchaser with an affidavit stating the valve and all materials used in its construction conform to the applicable requirements of this standard and the supplementary specifications and that all tests specified therein have been performed and met. BUTTERFLY VALVES A. Scope This specification covers butterfly valves of the approved type. Specific Requirements Standard All butterfly valves shall conform to the requirements of AWWA C504 in all respects, except as may be specifically modified herein. General Butterfly valves are to be Dresser, Series 450 or Groundhog Series as manufactured by Henry Pratt Company. Valve ends shall be suitable for flange connections. Valve body shall be high- strength cast iron ASTM A126 Class B with 18-8 Type 304 stainless steel body seat. Valve vane shall be high-strength cast iron ASTM A48 Class 40, having rubber seat mechanically secured with an integral 18-8 stainless steel clamp ring and 18-8 stainless steel self-locked screws. xxxEND_PAGE:deq01_b033_1845_3570_0316 002161 ROWE: COF 7 OF 21 SEPTEMBER 2012 Rubber seat shall be a full-circle 360 degree seat not penetrated by the valve shaft. Valve shaft shall be one piece, extending full size through the entire valve and operator with no neck-down, keyways, or holes to weaken it. Valve shaft shall have 304 stainless steel journals rotating in reinforced teflon bearings. Valve shall have permanently set two-way thrust bearing. Packing shall be “triple-seal" rubber designed for permanent duty in underground service. Valve operator shall be of the traveling-nut type, sealed, gasketed and lubricated for underground service. It shall be capable of withstanding an overload input torque of 450 ft. Ibs. at full-open or full-closed position without damage to the valve or valve operator. It shall be designed to resist submergence in water of 25 ft. head pressure. Valve shall be capable of easy closure by one person using standard valve key, even under emergency line-break conditions as severe as those that may require a valve maximum opening torque requirement of as much as two times AWWA Class 150B. All valves shall open to the right (clockwise) and be equipped with a 2" square AWWA operating nut. The manufacturer shall supply catalog data including illustrations and part schedules. The manufacturer shall furnish the purchaser with an affidavit stating the valve and all materials used in its construction conform to the applicable requirements of this standard and the supplementary specifications and that all tests specified therein have been performed and met. CHECK VALVES A. Scope This specification covers check valves of the approved type. Specific Requirements Standard The valves covered by this specification shall be in conformance with requirements of the current AWWA Specification and ANSI B16.1 Class 125 rated to a minimum of 250 psi. General Check valves shall: be manufactured from gray cast iron meeting or exceeding ASTM A126 Grade B; comply with AWWA C508; allow for clear waterway opening; possess a ductile iron clapper arm conforming to ASTM A536 Grade 65-45-12; possess a disc which does not contact the body when the valve is in full-open position; possess a shaft which is stainless steel with corrosion resistant bearings. xxxEND_PAGE:deq01_b033_1845_3570_0317 002162 ROWE: COF 8 OF 21 SEPTEMBER 2012 Check valve brand shall be American Flow Control 50-SC swing check valve or approved equal. TAPPING VALVES AND SLEEVES ‘A: Scope This specification covers tapping valves and sleeves of the approved type. B. Specific Requirements i. Standard The valves, hardware and sleeves covered by this specification shall be in conformance with requirements of the current AWWA Specification rated to a minimum of 250 psi. ii. General Tapping valves, hardware, sleeves and flanges shall be an approved type, as proposed by Shop Drawing submittal, as manufactured by East Jordan Iron Work for FlowMaster® Sleeves, flanges, and hardware shall be stainless steel. LEVEL CONTROL VALVES A. Scope This specification covers level control valves of the approved type. B. Specific Requirements Standard The valves, hardware and sleeves covered by this specification shall be in conformance with requirements of ie current AWWA Specifi ication rated to a minimum of 250 psi. General Level control valves are to be Singer Valve model 106-A-Type 3 / 206-A- Type 3, as manufactured by Singer Valve Company. Valve ends shall be suitable for flange connections. Both the Model 301-4 Pilot spring range (elevation) and Model 625-RPD differential (delayed opening) set-point preset's are to be set by Singer Valve. The City Engineer will be provided ranges prior to contractor purchasing/ordering the valve. xxxEND_PAGE:deq01_b033_1845_3570_0318 002163 ROWE: COF J. 9 OF 21 SEPTEMBER 2012 IN LINE STOPS A. Scope This specification covers in line stops of the approved type. Specific Requirements Standard The valves covered by this specification shall be in conformance with approved standards as determined by the City of Flint and the Engineer. General In line stops are to be the approved type and manufacturer, as proposed by Shop Drawing submittal. This specification covers post-type dry-barrel hydrants. B. iB ii: Hydrants 1. Scope 2. Specific Requirements A. Standard The hydrants covered by this specification shall be in conformance with requirements of the current ANSI/AWWA Standard C502 with revisions to date. Hydrants also shall be Underwriters Laboratories Standard UL246 listed and Factory Mutual 1510 approved, The Ductile Iron castings shall be manufactured from iron conforming to ASTM A536, and the following supplemental specifications. General Hydrants are to be East Jordan Iron Works Model 5BR250, part #55512D. Hydrants are to be of the “Breakable” or “Traffic Type" with replaceable components of barrel and stem. The hydrants shall be compression type shut-off which will remain closed in event of accidental damage or breaking of the barrel. The seat valve shall be bronze to bronze material. Hydrants are to have 5-1/4” inch main valve and 6-inch side inlet. Inlet to have mechanical joint unless otherwise specified on bid sheet. The hydrants shall be provided with a drain or waste outlet which is part of the main valve mechanism; at delivery the drain or waste outlet is to be tapped and plugged. Hydrants are to have "O" ring packing. The hydrant shall be painted chrome yellow. The top of hydrants shall be painted according to the standard detail xxxEND_PAGE:deq01_b033_1845_3570_0319 002164 ROWE: COF K. Fittings 1. Scope 10 OF 21 SEPTEMBER 2012 sheet in the plans. Hydrants will open to right (clockwise) and the direction of opening shall be clearly shown by an arrow and word “open” cast in relief, so as to be clearly visible on the top of the hydrant. Hydrants shall have two 2.1/2 inch hose nozzles and one 4 1/2 inch pumper nozzle with NST threads and caps with chains. Operating and cap nuts are to be square. The square is to measure 7/8 inches across the flats at the base and not less than 3/4 inches at the top. Height of the nut is not to be less than one inch. Mechanical joint hydrants are to include joining material. Hydrants shall be designed so that extensions to the barrel may be added above ground without excavation. Hydrant design shall be such that no excavation is necessary to remove the main stem and the movable parts of the drain valve. Trench Details are as noted on the plan sheets. The standard depth of bury (DOB) for a hydrant is 6'0” unless otherwise noted on plans. The contractor will salvage and deliver to the City all existing hydrants. The hydrants shall be painted as noted in the plans (detail sheet). This specification covers ductile iron fittings 3 - 48 in. for water. Specific Requirements a.. Standard The fittings covered by this specification shall be in conformance with requirements of the current AWWA Standard C 153/A21.53 and C 111/A 21.11 and the following supplemental specifications. General All fittings are to be mechanical joint, cement lined, with a 350 psi pressure rating. When requested, fittings should be supplied to fit over both centrifugally cast and sand cast pipe. Mechanical joint fittings are to include joining material. Gatewell Rings and Cover Gatewell castings shall be East Jordan Iron Works No. 104018L01 with cover type “CF-6”, or Valve Boxes approved equal. Cover shall contain type “A” legend with the text “WATER’ cast on it. Valve boxes are to be the EuIW 95E, Bibby 95E, or Tyler 6500 Screw Type, 2-piece, arch pattern for services. Boxes for mains shall be EJIW 8560 series 3-piece with #6 base as specified. Gray Iron will conform to ASTM A48 Class 35B gray iron with cold tar ashpaltic dip. Lids shall have the word “water” cast into the lid. xxxEND_PAGE:deq01_b033_1845_3570_0320 002165 ROWE: COF 11 OF 21 SEPTEMBER 2012 N. Encasement Pipe Steel pipe where specified for encasement pipe shall be new welded steel pipe and shall meet standards of ASTM 139, Grade B. The pipe shall be 1/4 (.250) inch to 13/32 (.406) inch wall thickness as specified on the plans and special provision if included in bid package. oO. Separator Skids Skid runners that completely separate casing and carrier pipes shall be utilized. Methods and materials shall be approved by the Engineer. Where hardwood runners are approved for banding to water carrier pipe, they shall be treated with solution. The solution shall consist of not less than 42 percent, nor more than 52 percent of pentachlorophenol dissolved in a heavy petroleum solvent. Then pentachlorophenol and the heavy petroleum solvents shall conform to the requirements of the current specifications for Timber preservatives, AASHTO Designation: M133. solution may be purchased as a ready-to-use product, or a concentrate to be diluted with the petroleum solvent. The wood may be pressure treated or may be immersed in the specified pentachlorophenol- petroleum for a period of at least seven days. Fd Anchoring Fitting When anchoring fittings are specified, they shall conform to the following: American Double-X or approved equal ductile retainer gland with cap screws. Clow F-1218 or approved equal special mechanical joint anchoring elbow. Clow F-1215 or approved equal anchoring coupling. Clow F-943 or approved equal special hydrant tee. Megalug series 1100 shall be used for mechanically restrainded joints. Q. Corporations and Curb Stops and Saddles shall be approved Ford type or similar approved. Detailed Specifications A. Scope Under this item, the Contractor will furnish all labor, pipe, valves, fittings, valve boxes, hydrants, manholes including rings and covers, service leads and any other material necessary for a complete main laying job. All materials and workmanship shall be as approved by the Engineer and City of Flint Water Service Center Distribution Supervisor. xxxEND_PAGE:deq01_b033_1845_3570_0321 002166 ROWE: COF 12 OF 21 SEPTEMBER 2012 B. Excavation The locations of existing utilities are shown in accordance with available data. The Contractor shall expose those utilities where required, to determine actual locations. The Contractor shall not disturb nor cut into any existing water mains in service without City of Flint Water Distribution Supervisor's approval. The Contractor shall explore the street far enough in advance of laying pipe to check exact locations of underground structures, sewers, water mains, services, also gas and electric structures. The Contractor shall contact the Engineer if any adjustments to plan and profile of new water mains are needed to avoid interference with existing structures, and the Contractor shall be responsible for all unnecessary Injusy to pesiorosings structures in the course.of his operations. Trenches for mains shall be excavated so that there will be a minimum net clearance of twelve inches on each side of the barrel of the pipe. Water main trenches shall be excavated to the lines, grade, and cross-section shown on the plans or to such modifications as may be approved Water Distribution Supervisor, or Engineer to meet or pass existing utility structures. Foreign materials encountered in the trench, such as slabs of wood, boulders, and the like, which obstruct the trench shall be removed with other excavation and where such obstructions occur, at or near the bottom of the trench, requiring excavation below the standard grade. Unnecessary excavation below grade by the Contractor shall be refilled to grade with tamped sand. Excess excavated materials not required in backfilling shall be removed and disposed of by the Contractor. The trench shall be brought back to grade by 1) backfilling to bottom of proposed aggregate base with approved sand meeting the requirements for MDOT Class I! granular Material, compacted to 95% of its maximum unit weight at optimum moisture content, and 2) placement of aggregate base as called for on the plans or, as a minimum, place 8 inches minimum depth of 100% crushed limestone meeting the requirements for MDOT dense graded aggregate 21AA, compacted to 98% of its maximum unit weight at optimum moisture content, Where condition of the ground requires, the sides of trenches shall be securely held by bracing sheeting which may be removed in units when the level of the backfill has reached dept where it is safe to pull the sheeting. No sheeting, bracing or other timber shall be left in the trench upon completion of the main or other structure. The contractor is required to control the infiltration of groundwater into‘the excavation. If ordinary methods of drainage such as bailing, pumping, etc., prove unsatisfactory, the contractor is responsible for dewatering. The bottom of the trench shall be shaped so as to conform as nearly as possible to the outside of the pipe, particular care being taken to recess the bottom of the trench in such manner to relieve the bell of all load. Where trench must be cut through pavement, driveway, or walk, particular care shall be taken to unnecessarily damage adjoining areas of pavement, driveway or walk. Cuts are to be made with a smooth edge by use of a concrete saw. Other underground mains, sewers or structures encountered in the excavation shall be adequately supported during the Contractor's operations, and before backfilling of the trench, shall receive a permanent support of lean concrete (C/ass B), extending from the xxxEND_PAGE:deq01_b033_1845_3570_0322 002167 ROWE: COF 13 OF 21 SEPTEMBER 2012 bottom of the trench to the underside of the main or other structure. In lieu of such concrete pedestal support, other approved support may be used satisfactory to the Water Distribution Supervisor. Small pipes and services encountered in the excavation shall, where deemed necessary by the Water Distribution Supervisor, be properly supported and protected from possible damage by lean concrete (Class B) or timber beams of adequate strength extending across the trench into undisturbed ground or by concrete pedestals extending to the bottom of the trench, or by other approved method. Cc. Laying Pipe and Fittings In handling or laying pipe, no metal shall be allowed to come in contact with the inside of the pipe. Care shall be taken not to damage the pipe or pipe coating and no damaged or - imperfect pipe may be used in the work. Minor damage to pipe coating may be repaired subject to the approval of the Water Distribution Supervisor. Pipe shall be carefully laid in the dry and to line and grade and care shall be taken to keep the interior of the pipe clean and free from dirt and other foreign materials. Rubber gasket plugs or approved bulkhead shall be used for this purpose. Mechanical joint pipe fittings shall be jointed with the bolts, gaskets and follower rings fumished by the pipe manufacturer, and the procedure in making such joints shall be in accordance with manufacturer's instructions and recommendations. Allin line bends, fitting, tees, solid sleeves, reducers, and hydrants shall be encased in 8 mil polyethylene. The polyethylene film tube shall be installed in accordance with ANSI/AWWA C 105/A21.5, Method A. Method A consists of cutting the polyethylene tube 2 feet longer than the pipe to provide an overlap at the joints. Single-rubber-gasket joint pipe shall be installed according to the manufacturer's instructions and recommendations and is to have the required number of brass wedges installed at all joints for electrical thawing. At crossings, one (1) full length of water pipe shall be located so both joints will be as far

RE: Flint DWRF - Preliminary Plans

Mike, We offer the following comments in response to your request for clarification on the items list below. 1. The 24-inch transmission main appears to show a parallel 24-inch main in Dupont St between Pasadena and Myrtle Ave. What is the purpose of the parallel main? The parallel main is incorrectly labeled and will be changed to 8 inch on the final plans. This parallel main iy being proposed to remove the 20) or sa services that are currently. connected lo the 24 inch transmission main, 2. The final stretch of 30-inch transmission piping on Flint WTP grounds from approx. Sta 404 +50 to the pump house is not shown. We are assuming that this stretch of piping will be shown on the final plans. According to the City of Flint Plant Supervisor, Brent Wright. the pump house is no longer necessary and therefore the portion of main was eliminated