. Fy .
EXAMINED AND APPR,
Hi Steve, WITHACT 30, Pa fone LANCE
Regarding your questing, D LP CP Y
i. The County plans to provide the ability to back flush the intake; however, these provisions are planned to be
incorporated into the pump station piping design. Having two intake cribs will enable us to supply water in he
event one is damaged by a boat collision or jost by icing.
2. We don’t believe that corrosion of the hardware will be a problem. Underwater, there is typically less available
_ oxygen so corrosion occurs very slowly. Warren Green indicated that a recent video inspection of the Saginaw-
Midland intakes showed that the hardware was in good condition. One intake was installed in 1947 and the
other in 1994. Warren indicated that hardware on the 1994 intake still has paint on it. The paint specified for
our project is a high quality 2 part epoxy. Also, the design for the crib is based on 20% of the strength of the
hardware, so substantial loss by corrosion would be needed before there will be an impact to the integrity of the
crib.
3. There is a reference in the specification regarding how the timber is to be grade-stamped if the timber will be
stained or visible, but we will not be putting a coating or stain on the timber. :
If there are other questions, please let me know. Thanks.
Jim Redding
Rowe Professional Services Company
810-869-5166
[email protected]