Tim Davidek

Assistant Director of Operations at Drain Commision / DWSD

11

Emails

Feb 2012–Oct 2015

Archive range

11 emails found.

Recommissioning the 72-inch transmission main

Based upon discussions with Genesee County and the city of Flint, the portion of the 72-inch transmission main (pipeline) that was taken out of service, while the Flint Water Treatment Plant (WTP) treated water from the Flint River, was flushed and disinfected in accordance to AWWA Standard C651-14. Two sets of samples were collected from two locations 16 hours apart for total coliform analysis. The city of Flint and Genesee County has informed the DEQ that both sets of samples are Non-Detect for total coliform. Based upon the disinfection procedure and the absence of total coliform from both sets of samples, the un-used portion of the pipeline may be placed into service. xxxEND_PAGE:deq04_b526_4922_4923_1 Michael Prysby, P.E. District Engineer Office of Drinking Water and Municipal Assistance 517 290-8817 xxxEND_PAGE:deq04_b526_4922_4923_2

Recommissioning the 72-inch transmission main

Date: Thursday, October 15, 2015 10:30:44 AM Based upon discussions with Genesee County and the city of Flint, the portion of the 72-inch transmission main (pipeline) that was taken out of service, while the Flint Water Treatment Plant (WTP) treated water from the Flint River, was flushed and disinfected in accordance to AWWA Standard C651-14. Two sets of samples were collected from two locations 16 hours apart for total coliform analysis. The city of Flint and Genesee County has informed the DEQ that both sets of samples are Non-Detect for total coliform. Based upon the disinfection procedure and the absence of total coliform from both sets of samples, the un-used portion of the pipeline may be placed into service. Michael Prysby, P.E. District Engineer Office of Drinking Water and Municipal Assistance 517 290-8817 xxxEND_PAGE:deq02_b432_3773_3773_1

Recommissioning the 72-inch transmission main

Date: Thursday, October 15, 2015 10:30:44 AM Based upon discussions with Genesee County and the city of Flint, the portion of the 72-inch transmission main (pipeline) that was taken out of service, while the Flint Water Treatment Plant (WTP) treated water from the Flint River, was flushed and disinfected in accordance to AWWA Standard C651-14. Two sets of samples were collected from two locations 16 hours apart for total coliform analysis. The city of Flint and Genesee County has informed the DEQ that both sets of samples are Non-Detect for total coliform. Based upon the disinfection procedure and the absence of total coliform from both sets of samples, the un-used portion of the pipeline may be placed into service. Michael Prysby, P.E. District Engineer Office of Drinking Water and Municipal Assistance 517 290-8817 xxxEND_PAGE:deq02_b433_3774_3774_1

(No subject)

To
Unknown recipient
Mike, Attached is the revision with the Dort Res. Added. | Thanks, Tim Davidek <cityofflint10815.doc> xxxEND_PAGE:deq04_b579_6765_7195_338 Rennaker, Joanne (DEQ)

(No subject)

Mike, Attached is the revised procedure. Thanks and have a great weekend, Tim Davidek Brent Wright i xxxEND_PAGE:deq02_b216_2370_2887_207 Water Plant Supervisor City of Flint 4500 N. Dort Hwy. Flint, MI. 48505 Ph: 810.787.6537 ext. 3510 Fx: 810.787.3710 xxxEND_PAGE:deq02_b216_2370_2887_208 Rennaker, Joanne (DEQ)

FW: Message from KM_C554e

Mike, Attached is the proposed disinfection bacti sampling procedure for the 72” water main along with a map. Thanks, , Tim Davidek | xxxEND_PAGE:deq02_b216_2370_2887_213 Michael Prysby, P.E. District Engineer Office of Drinking Water and Municipal Assistance Dear Mr. Prysby, Find enclosed the City of Flint and GCDC-WWS proposed disinfection procedure of the 72” water main to supply potable water produced by DWSD to the City of Flint. Thursday, October 8, 2015: Fill and pressurize the 72” water main from Genesee and Richfield roads to a closed valve at station 2, near the City of Flint Water Plant. Approximately 3.5 miles of water main will be filled and pressurized. This represents approximately 3.5 million gallons of water. Friday, October 9, 2015: Flush water from the 72” water main into the Dort Reservoir while introducing chlorine, utilizing the continuous feed method, into the 72” water main, near the intersection of Genesee and Richfield roads, in an effort to achieve a residual of 25 ppm. Hold for 24 hours. Saturday, October 10, 2015: Flush water from the 72” water main into the Dort Reservoir to remove highly chlorinated water

FW: Flint Twp 3261 Flushing Rd

John, Attached is an aerial of the area south 3264 Flushing Road. For the addresses/marcels with an M attached that address/parce! has public water. if there is nat an M associated with the address/narcel they do not have public water. Thanks, Tir: Davicdek Assistant Director - Operations xxxEND_PAGE:deq16_b5_0892_4900_2399 1 inch = 292 feet Q 3261 FLUSHING RD 5/4/2015 FLINT TWP. xxxEND_PAGE:deq16_b5_0892_4900_2400

FW:

Mike, All the wholesale communities, City of Flint and the County are good with March 1, 2012 from 10:00am to noon for the Stage 2 workshop. The City of Flint has agreed to provide a conference room at their water treatment plant. Let me know if this date is ok with you guys. Thanks, Tim Davidek xxxEND_PAGE:deq04_b077_2967_3228_253 Rennaker, Joanne (DEQ)