RE: Meeting with GCDC-WWS on KWA issues
Hi Chris-
Thanks for the heads up about this meeting concerning Norway Lake Road at Laneer State Garne Area. i'm assuming this
is ali related to the water pineline project? If the Lapeer County Road Commission is requesting a wider roadway,
Wildlife Division will need to know if they will be working outside of their existing right-of-way and/or if they require a
permanent easement. The land along Norway Lake Read was purchased with Pittmar-Robertson Funds and thus
requires US. Fish & Wildlife Service approval by the Minnesota office for any perrnanant conveyance of rights inland.
NEPA chocumertation is required.
Pve attached the funding source map for Lapeer County far your information.
The Genesee County Drain Commission (GCDC} did receive approwal and a permanent easement (350 long x 40’ wide}
for the pipeline crossing of the South Branch of the Flint River along Norway Lake Road (south side of the road). The
easement is attached. That process tank about 10 months. it would be best if we could avoid going through this process
again. When we met with GCC, all indications were they would be able to install the pineline within the existing road
ROW.
Piease let me know if there are any questions.
Thank you,
Jennifer Olson
Land Matters Biologist ~ SE region
DNR Widilfe Division
Rase Lake Field Office
8562 East Stoll Road
East lansing, Mi 48823
Office: (
Fax: (51
S17) 641-4903 ext, 266
7} 641-8022