DRAFT 9/17/2015
City of Flint Water System Background
Water Service Land Area 34 square miles
550+ miles of public water mains
250+ miles of water mains 75+ years old
70% of public water mains are unlined cast iron pipe
Service population 99,763
Service connections 32,900
Flint Water System established in 1883
Flint Water Treatment Plant #2 completed in 1954
Connection to Detroit Water and Sewerage Department 1967
Flint Water Treatment Plant #2 rehabilitated 1999 — 2005
City of Flint Timeline
April 2013 — Flint notifies DWSD of contract discontinuation and joins the Karegnondi Water Authority
April 2013 — DWSD sets termination of Flint water service contract to April 17, 2014
June 2013 — Karegnondi Water Authority groundbreaking
June 2013 — Flint notifies DEQ of intent to use of Flint Water Treatment Plant full time with Flint River
May 2014 — Flint stops purchasing DWSD water. Starts using the City of Flint WTP and Flint River
August 2014 ~ Flint £.Coli Bacteria violation, Partial System Boil Water Advisory
August 2014 — Disinfection Byproducts, DEQ requests preemptive Operational Evaluation
September 2014 — Flint Total Coliform Bacteria violation, Partial System Boil Water Advisory
November 2014 — Disinfection Byproducts violation begins
January 2015 — 1% 6 month lead and copper sampling completed 100 samples, 90% = 6 ppb
July 2015 — 2" 6 month lead and copper sampling completed 69 samples, 90'% = 11 ppb
August 2015 — Disinfection Byproducts return to compliance
August 2015 — Flint required by DEQ to recommend and install Optimized Corrosion Control Treatment
January 2016 — Flint plans to have Optimized Corrosion Control Treatment operational
July 2016 — Planned connection to Karegnondi Water Authority (Lake Huron water to Flint WTP)